Crithylum
Member
LU is replacing 86(.5) 73 stock trains with 94 24 stock trains, a 9.3% (or 8.7%) increase.
There is also a planned upgrade from 24 to 27tph pre signalling upgrades, a 12.5% increase.
Given that the new trains will likely be slightly faster when driven manually, the increase in frequency should be covered by the increase in the number of trains.
However, the planned increase from 27 to 36 with further upgrades is a 33% increase. Will this require more trains to be ordered? Or will track improvements and ATO allow the trains to be fast enough for the currently ordered fleet size?
Another thing to possibly factor in is the effective short turning at Ealing Broadway if it is taken over from the District line
There is also a planned upgrade from 24 to 27tph pre signalling upgrades, a 12.5% increase.
Given that the new trains will likely be slightly faster when driven manually, the increase in frequency should be covered by the increase in the number of trains.
However, the planned increase from 27 to 36 with further upgrades is a 33% increase. Will this require more trains to be ordered? Or will track improvements and ATO allow the trains to be fast enough for the currently ordered fleet size?
Another thing to possibly factor in is the effective short turning at Ealing Broadway if it is taken over from the District line