However, some of these interlockings have suffered from degradation of the wiring - it seems some of what was used in the 70s and 80s tended to have the insulation get crumbly after a few decades. This can make it impossible to modify an interlocking unless all of it is replaced, or even trigger replacement. I assume the recent re-wiring of Gloucester was for this sort of reason.Most of the electronics used in pre-1990s signalling scheme was for non-vital functions, such as remote control and train describers. These have generally all been replaced by more modern systems as they became obsolete. The underlying interlocking used relays, that are still available.
The increasing use of communications protocols over serial links between signalling equipment, rather than hardwiring each function individually, makes it easier to replace parts of the system instead of replacing it all. The new subsystem generally emulates the protocol to talk to the older one. So now we often see relocking and recontrolling instead of full re-signalling.