Techniquest
Veteran Member
Yes, I've done it on many occasions. Leaves Leeds via Garforth and Church Fenton, to York and then straight up the ECML.
The set runs then down to London at 14:48 before running back on the last London to Leeds which is routing via Pontefract but often runs via Wakefield or via Hambleton.
PSUL reckons it only goes the booked way (2330 KGX - LDS booked via Adwick then near Wakefield Kirkgate and Woodlesford) when engineering works force it. What blockade would be needed to ensure that it goes that way?