North East ECML cut offs

Status
Not open for further replies.

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,505
Location
Northampton
True, although I think Cramlington is too far south for the southern bypass terminus. South west of the village of Hepscott makes more sense - you avoid having to thread your way out of Cramlington and dodge Plessey Woods Country Park.
Locations were approximate, for a clearer explanation of my concept see this snip:
1752693233799.png
Which leaves room for the Morpeth services to extend to Widdrington, although if you wanted to save a few bob it could join nearer Pegswood.
Fair, I've got no local knowledge of the commuting patterns.

== Doublepost prevention - post automatically merged: ==

HS2 was never planned to do anything north of Colton on the ECML. There would have been one branch running from the south into Leeds, and one branch joining the ECML somewhere near Colton, and then trains running to York and Newcastle would be on the classic lines from there north, there was no York by-pass planned.
Ah fair enough I've obviously misremembered or conflated various non-official ideas.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,159
Locations were approximate, for a clearer explanation of my concept see this snip:
View attachment 184139
Which leaves room for the Morpeth services to extend to Widdrington, although if you wanted to save a few bob it could join nearer Pegswood.

Fair, I've got no local knowledge of the commuting patterns.
The problem is that there isn't a huge amount up near Widdrington, so an extension isn't necessarily justified from a local services point of view. For intercity services, a Morpeth bypass certainly works.

The Dudley/Cramlington end of the bypass is interesting. You may cut through a golf course between Dudley and the A19.

I'm not sure of the virtue of starting it that far south, as it's already 110mph line speed as far as the south end of Morpeth, and if you continue as far as West Chevington (north of Widdrington), 1) you still get a decent amount of mileage at 140mph potentially and 2) land is more freely available north of Morpeth.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,505
Location
Northampton
The problem is that there isn't a huge amount up near Widdrington, so an extension isn't necessarily justified from a local services point of view. For intercity services, a Morpeth bypass certainly works.
I'd extend when massive expansion of Pegswood and Widdrington begin to build housing for the Newcastle commuter belt. Until then, turning at Morpeth is fine. But as I say, you could absolutely tie in just east of Pegswood.
The Dudley/Cramlington end of the bypass is interesting. You may cut through a golf course between Dudley and the A19.
I'll live with one less golf course in the world. More important is missing the Northumberlandia/Lady of the North monument.
I'm not sure of the virtue of starting it that far south, as it's already 110mph line speed as far as the south end of Morpeth, and if you continue as far as West Chevington (north of Widdrington), 1) you still get a decent amount of mileage at 140mph potentially and 2) land is more freely available north of Morpeth.
From my eyeballing of it on google maps informed by a fair few involvements with actual rail projects, starting north of Cramlington means the divergence would impose a speed restriction below 125mph. 140mph isn't going to be worth it on legacy infrastructure (it's not just in-cab signalling, it's swingnose crossings, higher-spec OLE, no open platforms, etc), so this line is intended to diverge at 125mph and maintain that speed. The classic line could potentially be derated to ease cant deficiencies and maintenance burdens if worth it. Once the high-speed stuff is out you only need 90-100mph for the commuter units as the freights are limited to 75mph (although worth leaving it at 100mph if the freight ever gets that fast).
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,085
Location
Redcar
Fair, I've got no local knowledge of the commuting patterns.
There are quite strong commuter flows on the ECML into and out of Newcastle (I mean we're not talking South Eastern into Cannon Street or something but still, comparatively strong :lol:) which do cause issues from time to time.

For instance the draft December 2025 timetable originally axed a key long distance service which was being used for heavy commuter purposes (the 0822 from Durham which is the ex-Leeds to Aberdeen which now starts back from London and runs in a slightly different path) meaning there was a thirty odd minute gap in the middle of the morning peak which was expected to cause issues with capacity (as the train before was a 5-car TPE which will already be busy at that time of day). I believe this has now been resolved with LNER running a short working from Darlington to Newcastle at a suitable time using a 5-car set.

But it illustrates the point that it would be unwise to assume that there isn't strong demand from local station into and out of Newcastle (on both sides). Of course various proposed ways of increasing capacity on the ECML proper would be quite helpful in this regard as I reckon there probably is untapped demand into Newcastle (check the number of buses from Chester-le-Street to Newcastle for instance) but there's very little scope for tapping into that right now due to the constrained nature of the infrastructure.
 

FGWHST43009

Member
Joined
3 Nov 2020
Messages
253
A clean Cramlington-Widdrington Morpeth cutoff is a nice easy solution that has minimal impact on local services other than releasing pressure on clearing the mainline at Morpeth. Given barely any LNER stop at Morpeth anyway, and Lumo need extraction, continuing the current pattern of interchanging at Newcastle Central and Lumo can use the historic line is absolutely fine.
I agree, would XC and TPE cease serving Morpeth as well? They do seem to like their intercity services. However a frequent local with a good connection at Newcastle could be better but it was mentioned previously that there aren't any more paths between Newcastle and Benton Junction. How about Northern order 110-125 capable stock as part of their Sprinter replacement order so they can fit better with LNER, XC and TPE? Also upgrading the turnouts at Benton to be higher speed would also improve capacity
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,159
I'd extend when massive expansion of Pegswood and Widdrington begin to build housing for the Newcastle commuter belt. Until then, turning at Morpeth is fine. But as I say, you could absolutely tie in just east of Pegswood.
Maybe Pegswood would be suitable for that, but I think more urban extensions north of that aren't feasible. More development of that nature is probably heading for Blyth and Ashington, if anywhere in Northumberland.
I'll live with one less golf course in the world. More important is missing the Northumberlandia/Lady of the North monument.
I would agree, although golf courses are notoriously difficult to negotiate with in the planning stage. Avoid the hassle by avoiding it and it will save time/money.
From my eyeballing of it on google maps informed by a fair few involvements with actual rail projects, starting north of Cramlington means the divergence would impose a speed restriction below 125mph. 140mph isn't going to be worth it on legacy infrastructure (it's not just in-cab signalling, it's swingnose crossings, higher-spec OLE, no open platforms, etc), so this line is intended to diverge at 125mph and maintain that speed. The classic line could potentially be derated to ease cant deficiencies and maintenance burdens if worth it. Once the high-speed stuff is out you only need 90-100mph for the commuter units as the freights are limited to 75mph (although worth leaving it at 100mph if the freight ever gets that fast).
I agree that we should be aiming for a minimum of 125mph, but shouldn't we be aiming for 140mph and above on new stretches of line, whether they are integrated into the classic network or not?
The IETs are 140mph capable (and the 897s won't be operating as far north as Morpeth as far as I know).
This stretch will have no open platforms, higher spec OLE + swingnose crossings would be relatively small additional expenses as a proportion of the scheme cost.
It makes sense to future proof the alignment and design for 140mph, even if it isn't immediately utilised (especially if HS2 Phase 2b is eventually built and a subsequent 140mph upgrade programs begins on some other stretches of the ECML).
How about Northern order 110-125 capable stock as part of their Sprinter replacement order so they can fit better with LNER, XC and TPE?
I would strongly suggest the upcoming large regional order for TOCs including Northern will be 100mph capable units for fleet uniformity reasons.
Northern's last order included the 100mph capable Class 195s and 331, so it would make sense to standardise on this as a top operating speed that is relevant on pretty much every route they operate on for a significant amount of time.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,505
Location
Northampton
Maybe Pegswood would be suitable for that, but I think more urban extensions north of that aren't feasible. More development of that nature is probably heading for Blyth and Ashington, if anywhere in Northumberland.
I would like to future proof for 2150, but I recognise the constraints. I also have an idea of building something similar to the old curve between Pegswood and Ashington so that the Northumberland line services can be turned into rounders without having to worry about turning off one station too early (this would allow Morpeth-Bedlington to be abandoned and save a fair bit of cash). An ECML cutoff would need to avoid such a link.
I would agree, although golf courses are notoriously difficult to negotiate with in the planning stage. Avoid the hassle by avoiding it and it will save time/money.
Buying out the golf course would be pennies in the scheme of this project tbh. Maybe get a long-term plan and encourage as many railway staff as possible to join up first so they can vote in the AGM.... <D
I agree that we should be aiming for a minimum of 125mph, but shouldn't we be aiming for 140mph and above on new stretches of line, whether they are integrated into the classic network or not?
The IETs are 140mph capable (and the 897s won't be operating as far north as Morpeth as far as I know).
This stretch will have no open platforms, higher spec OLE + swingnose crossings would be relatively small additional expenses as a proportion of the scheme cost.
It makes sense to future proof the alignment and design for 140mph, even if it isn't immediately utilised (especially if HS2 Phase 2b is eventually built and a subsequent 140mph upgrade programs begins on some other stretches of the ECML).
The difference between 125mph and 140mph is in the order of 2-3seconds per mile. A cutoff like this is accepting the 125mph ruling speed, so 140mph makes no sense. If you're building a completely new line from Newcastle to Edinburgh, then you'd build it for 180-200mph (300-350kph), not 140mph.
I would strongly suggest the upcoming large regional order for TOCs including Northern will be 100mph capable units for fleet uniformity reasons.
Northern's last order included the 100mph capable Class 195s and 331, so it would make sense to standardise on this as a top operating speed that is relevant on pretty much every route they operate on for a significant amount of time.
Yes but between Newcastle and Morpeth are they actually hitting 100mph? I'd suggest only for the briefest of margins. Improving journey times is about raising the lowest common denominator, not the highest individual point. Floors not ceilings, if you will.
I agree, would XC and TPE cease serving Morpeth as well?
In my mind, no. Morpeth would be served by a 2tph or more even-interval connection to Newcastle station timed to connect to Southbound LNER.
However a frequent local with a good connection at Newcastle could be better but it was mentioned previously that there aren't any more paths between Newcastle and Benton Junction.
Does anybody have the link to this study? The biggest capacity issues are usually stoppers vs fast, then platform capacity, then conflicts at junction. There's only Manors on that section, it's not supremely fast, it's not that long. IIRC the headway is 4 or thereabouts, so in theory there's 15 paths in each direction, minus a few for the single line at Benton North, minus a few more for the slower runtimes of freight and the trains that stop at Manors.
I'd have thought getting that throughput at Newcastle's long platforms would be the issue, not the plainline section.
Although I'd also support 4-tracking of this section in a paired by use arrangment (fasts on the west, slows on the east) to reduce conflicts at Heaton and Benton between trains turning out and fasts.

== Doublepost prevention - post automatically merged: ==

The golf course is on the Cramlington side of the A19 and is missed by that hypothetical line.
the hypothetical line is not an engineer's proposal, but a rough indication of the concept. It would almost certainly need to be straightened out for a 125mph speed and would likely go straight through at least part of the golf course.
 

Brubulus

Member
Joined
13 Oct 2022
Messages
974
Location
Cambridge
I would like to future proof for 2150, but I recognise the constraints. I also have an idea of building something similar to the old curve between Pegswood and Ashington so that the Northumberland line services can be turned into rounders without having to worry about turning off one station too early (this would allow Morpeth-Bedlington to be abandoned and save a fair bit of cash). An ECML cutoff would need to avoid such a link.

Buying out the golf course would be pennies in the scheme of this project tbh. Maybe get a long-term plan and encourage as many railway staff as possible to join up first so they can vote in the AGM.... <D

The difference between 125mph and 140mph is in the order of 2-3seconds per mile. A cutoff like this is accepting the 125mph ruling speed, so 140mph makes no sense. If you're building a completely new line from Newcastle to Edinburgh, then you'd build it for 180-200mph (300-350kph), not 140mph.

Yes but between Newcastle and Morpeth are they actually hitting 100mph? I'd suggest only for the briefest of margins. Improving journey times is about raising the lowest common denominator, not the highest individual point. Floors not ceilings, if you will.

In my mind, no. Morpeth would be served by a 2tph or more even-interval connection to Newcastle station timed to connect to Southbound LNER.

Does anybody have the link to this study? The biggest capacity issues are usually stoppers vs fast, then platform capacity, then conflicts at junction. There's only Manors on that section, it's not supremely fast, it's not that long. IIRC the headway is 4 or thereabouts, so in theory there's 15 paths in each direction, minus a few for the single line at Benton North, minus a few more for the slower runtimes of freight and the trains that stop at Manors.
I'd have thought getting that throughput at Newcastle's long platforms would be the issue, not the plainline section.
Although I'd also support 4-tracking of this section in a paired by use arrangment (fasts on the west, slows on the east) to reduce conflicts at Heaton and Benton between trains turning out and fasts.

== Doublepost prevention - post automatically merged: ==


the hypothetical line is not an engineer's proposal, but a rough indication of the concept. It would almost certainly need to be straightened out for a 125mph speed and would likely go straight through at least part of the golf course.
The fundamental problem with any ECML cut off north of Newcastle is that the ECML is around 10-12 minutes slower than HS2 for London-Edinburgh traffic, and while Newcastle and Leeds are important markets, there's limited point in building a cutoff just for them. The WCML going to host trains from London, the Midlands and Manchester to Scotland.

There might be an argument for cutoffs south of Newcastle, in order to reduce journey times to Newcastle, though more careful attention has to be paid to the stops missed in comparison to the WCML, so even then WCML cutoffs are likely to be better value for money.

Before we even think about cutoffs, HS2 must reach Golborne.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,505
Location
Northampton
The fundamental problem with any ECML cut off north of Newcastle is that the ECML is around 10-12 minutes slower than HS2 for London-Edinburgh traffic, and while Newcastle and Leeds are important markets, there's limited point in building a cutoff just for them. The WCML going to host trains from London, the Midlands and Manchester to Scotland.

There might be an argument for cutoffs south of Newcastle, in order to reduce journey times to Newcastle, though more careful attention has to be paid to the stops missed in comparison to the WCML, so even then WCML cutoffs are likely to be better value for money.

Before we even think about cutoffs, HS2 must reach Golborne.
Oh I completely agree, but the premise of the thread was about ECML cutoffs. You'll get far better returns from building Preston-Carlisle and Carlisle-Carstairs sections of HS2.
 

stevieinselby

Established Member
Joined
6 Jan 2013
Messages
1,676
Location
Selby
Yes but between Newcastle and Morpeth are they actually hitting 100mph? I'd suggest only for the briefest of margins. Improving journey times is about raising the lowest common denominator, not the highest individual point. Floors not ceilings, if you will.
Northern currently use mostly class 156s with the occasional 158 on Morpeth services, so no they don't hit 100mph!
If the DMU fleet at Heaton was replaced with 100mph stock and the timetable recast for 100mph local paths then I don't see any reason why even DMUs wouldn't be running at full speed for a few miles at a time between Morpeth and Cramlington, and between Cramlington and Manors/Newcastle.
 

FGWHST43009

Member
Joined
3 Nov 2020
Messages
253
Northern currently use mostly class 156s with the occasional 158 on Morpeth services, so no they don't hit 100mph!
If the DMU fleet at Heaton was replaced with 100mph stock and the timetable recast for 100mph local paths then I don't see any reason why even DMUs wouldn't be running at full speed for a few miles at a time between Morpeth and Cramlington, and between Cramlington and Manors/Newcastle.
FLIRTs are probably the best fit given that Northern want BEMUs I believe. Acceleration would definitely be needed for getting off Benton Junction
 

Snex

Member
Joined
20 Jun 2018
Messages
446
I know a lot of the discussion is about North of Newcastle but assuming Leamside is built, I'd always love to see a Durham Coast Line Bypass which in turn acts as a East Coast Mainline Bypass aswell, something on the lines of:
Durham_Coast_Bypass.png

The purple section being ex railways and the pink bits connecting it together.

It means you'd get a fast Newcastle - Sunderland Parkway (Shiney Row) - Teesside (Stockton somewhere) - South service which right now the links are constrained on the awful Durham Coast Line which is way too slow. Teesside right now has an absymal service so throwing a Cross Country and a Newcastle LNER terminator up that way could be popular and opens up 2 paths on the ECML and wouldn't be the end of the world a much longer route.

The links within the North East right now, are terrible.
 

IanXC

Emeritus Moderator
Joined
18 Dec 2009
Messages
6,611
Their best bet is more capacity for local services. They might even be better off having a new platform in the car park for trains from the Blyth & Tyne line via Hepscott.

Actually you may be on to something here, in a slightly different way. Looking at the dwell times for Northern services terminating in Morpeth then shunting ECS onto the start of the Hepscott line, there is probably something to be said for providing a platform there for terminating services from Newcastle. I guess it would be somewhat like platform 4 at York being used for terminating trains from the south - that would certainly have an ECML performance benefit if nothing else.

There is an aspiration (very long term) to run tram trains to Doncaster from Sheffield (or Barnsley!) in which case you could imagine the trams coming off near Cherry Tree Road and taking a route to the front of the rail station. There's already a Doncaster avoider on that route. That said, I'd agree with Doncaster getting an overhaul to regularise platform lengths and to allow services to be segregated better (the EMR ones to Lincoln and Peterborough leave from P2 or P5, the latter requiring a cross over the through lines).

Indeed. There appear to be two leading options for grade separating Doncaster, both involve platforms 9 and 10 in what is currently the West Yard, either then proceeding via a multiple unit only (read steep) chord to the Doncaster avoider and hence towards Thorne, or otherwise heading on the Leeds lines to Adwick and then taking the Skellow branch towards Thorne.

It is now (23/24) apparently third, after Cambridge and Peterborough, but only just.
Fourth place is Leeds, which is within a few percent.

1 million passengers from London to Edinburgh can't fill a substantial number of trains alone.

Aggregating flows provides economies of scale and makes higher intensities economic, which in turn makes the service more convenient and more attractive.

Of course the direction of travel is clear with the Kings Cross - York - Newcastle - Edinburgh expresses in the December timetable, its also worth remembering that at least one stop is inevitable for a crew change anyway.
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,159
I would like to future proof for 2150, but I recognise the constraints. I also have an idea of building something similar to the old curve between Pegswood and Ashington so that the Northumberland line services can be turned into rounders without having to worry about turning off one station too early (this would allow Morpeth-Bedlington to be abandoned and save a fair bit of cash). An ECML cutoff would need to avoid such a link.
Not a terrible idea.
Buying out the golf course would be pennies in the scheme of this project tbh. Maybe get a long-term plan and encourage as many railway staff as possible to join up first so they can vote in the AGM.... <D
It's not the price I was thinking about, it was their ability to disrupt the planning process!
The difference between 125mph and 140mph is in the order of 2-3seconds per mile. A cutoff like this is accepting the 125mph ruling speed, so 140mph makes no sense. If you're building a completely new line from Newcastle to Edinburgh, then you'd build it for 180-200mph (300-350kph), not 140mph.
Indeed, but I don't think we will get a HSL Newcastle to Edinburgh, and the IET (which will be around for decades longer) has a design speed of 140mph. So if we are talking incremental bypasses built on a few sections, why not claw back a bit of time with a 140mph top speed?
Yes but between Newcastle and Morpeth are they actually hitting 100mph? I'd suggest only for the briefest of margins. Improving journey times is about raising the lowest common denominator, not the highest individual point. Floors not ceilings, if you will.
No, but they will need to elsewhere on the network and it's simpler to standardise one fleet order with one top speed for maintenance reasons.
I know a lot of the discussion is about North of Newcastle but assuming Leamside is built, I'd always love to see a Durham Coast Line Bypass which in turn acts as a East Coast Mainline Bypass aswell, something on the lines of:
View attachment 184217

The purple section being ex railways and the pink bits connecting it together.

It means you'd get a fast Newcastle - Sunderland Parkway (Shiney Row) - Teesside (Stockton somewhere) - South service which right now the links are constrained on the awful Durham Coast Line which is way too slow. Teesside right now has an absymal service so throwing a Cross Country and a Newcastle LNER terminator up that way could be popular and opens up 2 paths on the ECML and wouldn't be the end of the world a much longer route.

The links within the North East right now, are terrible.
Although you have to consider that the Tyne and Wear Metro will be using part of the line, so it's unlikely that it could accomodate a truly fast service.
 

Brubulus

Member
Joined
13 Oct 2022
Messages
974
Location
Cambridge
I know a lot of the discussion is about North of Newcastle but assuming Leamside is built, I'd always love to see a Durham Coast Line Bypass which in turn acts as a East Coast Mainline Bypass aswell, something on the lines of:
View attachment 184217

The purple section being ex railways and the pink bits connecting it together.

It means you'd get a fast Newcastle - Sunderland Parkway (Shiney Row) - Teesside (Stockton somewhere) - South service which right now the links are constrained on the awful Durham Coast Line which is way too slow. Teesside right now has an absymal service so throwing a Cross Country and a Newcastle LNER terminator up that way could be popular and opens up 2 paths on the ECML and wouldn't be the end of the world a much longer route.

The links within the North East right now, are terrible.

South of Newcastle, the most reasonable cutoff is from Brafferton to Preston-le-Skerne, it would only remove a minute or so from journey times, but it saves almost a mile of distance and avoids a 85mph speed restriction. Would likely cost 9 figures so not sure if it's a good idea. The best way to get substantial journey time improvements would be the eastern leg, but since that is only truly needed for London-Newcastle, it won't happen. There is also a relatively cheap way to bypass Durham and that is to use the Leamside alignment, followed by a modular viaduct. I'm really not sure how much more is needed to get London-Newcastle, with a single stop at York, below 2h30. Maybe the Hitachi units could be approved for 150mph, and that then improves the benefits for the costs associated with speed increases, which are viable from Hitchin-Huntingdon (level crossing closures needed), Tallington-Stoke, Doncaster-York and York-Darlngton. That would likely take around 5 minutes off journey times, which would just about enable 2h30 London-Newcastle, calling at York only.

1752784490051.png
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,294
The cost of a suitable fleet of new trains will be small compared to the cost of even a modest cutoff.

As such, doesn't seem much point in designing for less than 300kph
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,159
The cost of a suitable fleet of new trains will be small compared to the cost of even a modest cutoff.

As such, doesn't seem much point in designing for less than 300kph
Maybe, 140mph seems best to start with (maybe the alignment itself could be suitable for 150-180mph) and then upgrading speeds a la LGV if rolling stock speeds keep up.
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,258
Location
Oxford
If doing an alignment for higher than 200kmh is straightforward when doing this kind of thing then it's probably a good idea to do that for future proofing. But all the other stuff (cab signals, swing nose points etc) will add a lot of cost and energy consumption to save 15 seconds (compared to running at 200kmh)
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,505
Location
Northampton
Maybe, 140mph seems best to start with (maybe the alignment itself could be suitable for 150-180mph) and then upgrading speeds a la LGV if rolling stock speeds keep up.
Once you tick up to 126mph, there is no point in going for anything less than the maximum achievable.
 

stevieinselby

Established Member
Joined
6 Jan 2013
Messages
1,676
Location
Selby
Indeed, but I don't think we will get a HSL Newcastle to Edinburgh, and the IET (which will be around for decades longer) has a design speed of 140mph. So if we are talking incremental bypasses built on a few sections, why not claw back a bit of time with a 140mph top speed?
There are two factors against that:

First, there is very little benefit from increasing speeds above 125mph for short sections. At that speed, trains will cover little or no distance at 140mph, because of the time it takes to accelerate and slow down at the start and end of the higher speed limit – the higher the prevailing line speed, the longer it takes to accelerate beyond it and the less running you have at appreciably higher speeds, meaning that the time saved is small. That is particularly true when looking at increasing linespeed on an existing line, where the cost and disruption is unlikely to pay dividends (unless it is part of other essential work) but it does also apply to a lesser extent when looking at any new section.

Second, there is a specific boundary issue at 125mph. Running at 125mph is permissible with lineside signals, but any faster than that requires in-cab signalling. Unless there is a widespread plan to resignal the ECML and switch to in-cab signalling, it is not going to be worthwhile doing it for a few miles through Northumberland in isolation.
 

FGWHST43009

Member
Joined
3 Nov 2020
Messages
253
There are two factors against that:

First, there is very little benefit from increasing speeds above 125mph for short sections. At that speed, trains will cover little or no distance at 140mph, because of the time it takes to accelerate and slow down at the start and end of the higher speed limit – the higher the prevailing line speed, the longer it takes to accelerate beyond it and the less running you have at appreciably higher speeds, meaning that the time saved is small. That is particularly true when looking at increasing linespeed on an existing line, where the cost and disruption is unlikely to pay dividends (unless it is part of other essential work) but it does also apply to a lesser extent when looking at any new section.

Second, there is a specific boundary issue at 125mph. Running at 125mph is permissible with lineside signals, but any faster than that requires in-cab signalling. Unless there is a widespread plan to resignal the ECML and switch to in-cab signalling, it is not going to be worthwhile doing it for a few miles through Northumberland in isolation.
Indeed, but I don't think we will get a HSL Newcastle to Edinburgh, and the IET (which will be around for decades longer) has a design speed of 140mph. So if we are talking incremental bypasses built on a few sections, why not claw back a bit of time with a 140mph top speed?
How about building with higher speeds in mind but starting operations at 125mph? A Morpeth bypass could be the first bit of a longer line which is built in stages but sadly unlikely to be built anytime soon. I'd extend to just north of Alnmouth to dodge the 85mph restriction there but obviously would be more expensive. Future-proofing sounds like a good idea for new lines. Maybe future proof for 250kmh?
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,294
We shouldn't be building new fast lines with lineside signals in any case, so there is little benefit in restricting operations to 125mph.

Modern high performance units can achieve average speeds approaching 110mph over 30km jumps stop-to-stop.
The length of track necessary to make 300kph running useful when the trains will have a rolling start and rolling stop is very short.

== Doublepost prevention - post automatically merged: ==

Unless there is a widespread plan to resignal the ECML and switch to in-cab signalling, it is not going to be worthwhile doing it for a few miles through Northumberland in isolation.
Which there is. The (southern) ECML is currently first on the list for ETCS conversion and work is AFAIK already underway.

== Doublepost prevention - post automatically merged: ==

If doing an alignment for higher than 200kmh is straightforward when doing this kind of thing then it's probably a good idea to do that for future proofing. But all the other stuff (cab signals, swing nose points etc) will add a lot of cost and energy consumption to save 15 seconds (compared to running at 200kmh)
How many swingnose crossings would a cut off line actually require?
You only require them if the route through the pointwork is higher than 125mph.

If the cutoff only has pointwork at the ends then there is no issue.
 
Last edited:

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,258
Location
Oxford
Build the fastest alignment sensibly possible (stopping short of needing slab track etc), but start operating at 125 and in reality that will probably be good enough for the foreseeable future.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,294
Locations were approximate, for a clearer explanation of my concept see this snip:
View attachment 184139
Which leaves room for the Morpeth services to extend to Widdrington, although if you wanted to save a few bob it could join nearer Pegswood.

Fair, I've got no local knowledge of the commuting patterns.

== Doublepost prevention - post automatically merged: ==


Ah fair enough I've obviously misremembered or conflated various non-official ideas.
I've thought about this a lot, and is this sort of routing really better than simply going west of Morpeth and sticking close to the A1?

You can, to some extent, avoid the slaloming around villages and rejoin slightly further north near Acklington.
 
Last edited:

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,505
Location
Northampton
I've thought about this a lot, and is this sort of routing really better than simply going west of Morpeth and sticking close to the A1?

You can, to some extent, avoid the slaloming around villages and rejoin slightly further north near Acklington.
I think you'd look at both routes for engineering feasibility. Both routes would have tricky sections of engineering but both seem much of a muchness. The advantage of 'cutting the corner' is that you keep the railway's footprint relatively contained but the advantage of 'flattening the curve' is that you're following the already reasonably straight not-a-motorway-honest-guv route.
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,159
Once you tick up to 126mph, there is no point in going for anything less than the maximum achievable.
Perhaps
There are two factors against that:

First, there is very little benefit from increasing speeds above 125mph for short sections. At that speed, trains will cover little or no distance at 140mph, because of the time it takes to accelerate and slow down at the start and end of the higher speed limit – the higher the prevailing line speed, the longer it takes to accelerate beyond it and the less running you have at appreciably higher speeds, meaning that the time saved is small. That is particularly true when looking at increasing linespeed on an existing line, where the cost and disruption is unlikely to pay dividends (unless it is part of other essential work) but it does also apply to a lesser extent when looking at any new section.

Second, there is a specific boundary issue at 125mph. Running at 125mph is permissible with lineside signals, but any faster than that requires in-cab signalling. Unless there is a widespread plan to resignal the ECML and switch to in-cab signalling, it is not going to be worthwhile doing it for a few miles through Northumberland in isolation.
1.) Maybe, but I thought that the most of the line north of Morpeth as far as Berwick was reasonably straight (and rural, so land is typically available should any upgrades of existing alignment be needed to reach 140mph).
2.) As HSTEd mentioned, the ECML is the pilot main
line for ETCS/ERTMS in cab signalling use. A new bypass would the perfect place to start the rollout on the northern sections, along with the Selby diversion (which I believe was specified for 140mph +, so requires a lot less upgrade work than other sections of classic railway does).
How about building with higher speeds in mind but starting operations at 125mph? A Morpeth bypass could be the first bit of a longer line which is built in stages but sadly unlikely to be built anytime soon. I'd extend to just north of Alnmouth to dodge the 85mph restriction there but obviously would be more expensive. Future-proofing sounds like a good idea for new lines. Maybe future proof for 250kmh?
Perhaps 125 would be a good starting point, but by the time the Morpeth bypass is built, I do think it will be the ideal place to test 140mph on the northern end of the line and therefore opening with in cab signalling would make sense. I don't think a bypass encompassing Alnmouth all the way from Morpeth would make more sense.
Design the Morpeth bypass to tie in at Chevington and then a separate Alnmouth bypass at some later point (Hipsburn to Rennington) would be more feasible
 

class26

Member
Joined
4 May 2011
Messages
1,199
Genuine question here. As we are discussing cut offs in Northumberland some of the line appears to to be perilously close to the cliff edge. What is the state of these cliffs regarding erosion as I would have thought that at some point the line is going to have to be moved inland? If that is the case then surely these desirable cut offs ought to all be put in the mix and planned accordingly ?
 

FGWHST43009

Member
Joined
3 Nov 2020
Messages
253
Genuine question here. As we are discussing cut offs in Northumberland some of the line appears to to be perilously close to the cliff edge. What is the state of these cliffs regarding erosion as I would have thought that at some point the line is going to have to be moved inland? If that is the case then surely these desirable cut offs ought to all be put in the mix and planned accordingly ?
Considering there are few to no intermediate stations on that section of route bypasses are fairly feasible without the locals getting annoyed about losing their local station. Maybe north of Berwick where the line gets curvier?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,259
Genuine question here. As we are discussing cut offs in Northumberland some of the line appears to to be perilously close to the cliff edge. What is the state of these cliffs regarding erosion as I would have thought that at some point the line is going to have to be moved inland? If that is the case then surely these desirable cut offs ought to all be put in the mix and planned accordingly ?
If you mean the stretch just north of Berwick, the line has already been tweaked inland just a bit many years ago, through the site of the present Marshall Meadows caravan park, but it’s only a relatively small offset, so I don’t think rapid cliff erosion was expected.

I think the next theoretical problem area is just over the border. It may be that for such a relatively short distance they’d protect the foot of the cliffs themselves, but we probably need a geology expert to work out the type of rock, and the possible engineering responses.
 