Surely it would be possible to refuel them from a road tanker in the sidings at Redhill (or anywhere else with road access)? I realise that needs spill precautions, but the construction industry routinely refuels diesel plant on site so it can't be prohibitively difficult or expensive.Presumably because GWR are unable to fuel units on the east side of the block. They would probably only last two days or so, even if they started with full tanks from Reading.
ISTR that GWR used to get Southern to fuel the units up (at Selhurst?) during blockades in the past. But with Southern Redhill drivers no longer working the 165s this is likely deemed to be in the "too difficult" pile - you'd need to get GWR Reading drivers to be route conducted by GTR etc. It's easier just to give up and bustitute the lot.
It does seem that buses or even "do not travel" notices have become the railway industry's first resorts rather than last. Which drives ever more passengers off trains and onto alternatives if they have to travel for work or other unavoidable reasons.