89-763-733
Member
- Joined
- 2 Jul 2011
- Messages
- 285
452 0553 Central-Larne Harbour until 1706 GVS-Larne Harbour
453 1725 GVS-Larne Town until 2230 Larne Harbour-Central
454 0622 Central Larne Town until 1825 Whitehead-Central
454 failed at Greenisland on the 1142 Central-Larne A fitter travelled out to it on the following 1212 Carrick (80 class) and battered it. 454 was then able to procede to Carrick where it was terminated. It resumed its diagram with 1330 ex Carrick, 1257 ex Larne being a bus
455 0657 GVS-Whitehead until 1845 Larne Town-Central
456 and 457 unserviceable YR Depot
458 1648 GVS-Carrickfergus until 2230 Central-Larne Harbour
459 Portrush Branch including last DEMU worked 1158 CE/LY and 1310 LY/CE
The 90+94 set worked from 0942 CL/LR until the end of the diagram
3010 worked 0625 Central-Whitehead until 0900 Whitehead-Central (first part of 80 diagram)
3008 worked 1600 Carrickfergus-Central until 1950 Larne Town-Central
453 1725 GVS-Larne Town until 2230 Larne Harbour-Central
454 0622 Central Larne Town until 1825 Whitehead-Central
454 failed at Greenisland on the 1142 Central-Larne A fitter travelled out to it on the following 1212 Carrick (80 class) and battered it. 454 was then able to procede to Carrick where it was terminated. It resumed its diagram with 1330 ex Carrick, 1257 ex Larne being a bus
455 0657 GVS-Whitehead until 1845 Larne Town-Central
456 and 457 unserviceable YR Depot
458 1648 GVS-Carrickfergus until 2230 Central-Larne Harbour
459 Portrush Branch including last DEMU worked 1158 CE/LY and 1310 LY/CE
The 90+94 set worked from 0942 CL/LR until the end of the diagram
3010 worked 0625 Central-Whitehead until 0900 Whitehead-Central (first part of 80 diagram)
3008 worked 1600 Carrickfergus-Central until 1950 Larne Town-Central