New Rail line near Newport

Status
Not open for further replies.

Dai Corner

Established Member
Joined
20 Jul 2015
Messages
6,998
where will the GWR 12 car crowdbusters park up then when awaiting match finishes?(and free platforms) Weren’t they one of bigger reasons behind this stabling line?
I’m going to guess there aren’t many places you can hide a small fleet of 9-12 car trains awaiting a match finish.
On the Down Relief line between Severn Tunnel Junction and Cardiff? That's the only place I can think of that's electrified.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

oglord

Member
Joined
13 Oct 2010
Messages
377
Location
Newport, Monmouthshire
On the Down Relief line between Severn Tunnel Junction and Cardiff? That's the only place I can think of that's electrified.
There are various sidings, such as Pengam, the Up/down good siding at Ebbw Junction and Up branch down at East Usk that are electrified too, but how many 387s can they hold?
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,135
The 3 Pengam sidings could each take a 12 car set. You can also hold a train in the Pilning loop. I doubt more than 12 units could be made available, in which case electrified sidings is not a problem.
 

Signal_Box

Member
Joined
25 Dec 2021
Messages
739
Location
UK
Options East of Cardiff:

Wentlogg is busy 24/7, and it only has 3 lines anyway. Access from the Cardiff direction is limited due to having to run “wrong road” Up direction, Dn line from Pengam so on a day when you need all your capacity you would sap it using Wentlogg - even if the terminal operator allowed you to.

Pengam, three OHL equipped roads TfW drivers sign it as well as it’s used daily for empty stock shuttles from….Central.
Nice and easy to get to, only 5 minutes travelling time to/from Central. Ideal, but not made use of.

You won’t get access to the tidal yard for passenger stock, and it’s very restricted operationally.

Using the Machen branch - no chance, and no point.

Stabling east of Newport, always been doubtful of the benefit it’s a good 20/25 minute travelling time to start with before you look at the investment for new siding space on Tata land I believe.

Options West of Cardiff:
Barry depot, potentially but has a rather long bothering shunt on and off, one train at a time. Add in 30 minute travelling time makes it less beneficial especially on event days.

Canton depot, perfect? Hmmm, congestion on and off event if you use all four exit/entry points.

Brickyard Sidings, you can stable more than one train in each road but you’ll need to ensure it’s planned perfectly so the right train is at the front of the queue!
Also has potential for at least two additional sidings, there is already one but OOU.

Anything further west is adding cost to travel time and resources.

== Doublepost prevention - post automatically merged: ==

The 3 Pengam sidings could each take a 12 car set. You can also hold a train in the Pilning loop. I doubt more than 12 units could be made available, in which case electrified sidings is not a problem.

You can’t stable essentially trains in loops, especially Pilning. Freight into the tunnel needs the loop to allow all the extra passenger trains to pass, you also have to take into consideration dangerous goods and prohibited trains before you start holding empty trains in there.

== Doublepost prevention - post automatically merged: ==

There are various sidings, such as Pengam, the Up/down good siding at Ebbw Junction and Up branch down at East Usk that are electrified too, but how many 387s can they hold?

There is the “2 way loop” at AD which is OHL equipped but again freight use it very regularly throughout the day. Often recesses during the event to allow capacity in Cardiff.

== Doublepost prevention - post automatically merged: ==

where will the GWR 12 car crowdbusters park up then when awaiting match finishes?(and free platforms) Weren’t they one of bigger reasons behind this stabling line?
I’m going to guess there aren’t many places you can hide a small fleet of 9-12 car trains awaiting a match finish.

They generally shuttle back and forwards between Cardiff and Newport, then stable on the brickyard siding or line A.

You can’t stable trains on running lines, so there isn’t anywhere between STJ and Newport. You could subject to it not being required by freight operators East Usk Reception 1 / 2.

== Doublepost prevention - post automatically merged: ==

Even if the new stabling point at Llanwern was built it’s not just two sidings, it’s connection to the Mainline with signalling alternations, lighting, walking routes, access points, staff accommodation, water and electric, gas, sewage points etc, it all adds up to make £10m not forgetting buying the land and making it suitable to build the above.
 
Last edited:

Dai Corner

Established Member
Joined
20 Jul 2015
Messages
6,998
Even if the new stabling point at Llanwern was built it’s not just two sidings, it’s connection to the Mainline with signalling alternations, lighting, walking routes, access points, staff accommodation, water and electric, gas, sewage points etc, it all adds up to make £10m not forgetting buying the land and making it suitable to build the above.
Just for clarification, I understand the £10m is what's been spent already and isn't recoverable rather an estimate of the cost of the project.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,264
Location
West Wiltshire
It seems incredible that a city that used to have over 20 miles of coal sidings within 1.5 miles of city centre, cannot find any unused trackbed to lay in some stabling sidings
 

Western 52

Established Member
Joined
19 Jun 2020
Messages
1,672
Location
Burry Port
It seems incredible that a city that used to have over 20 miles of coal sidings within 1.5 miles of city centre, cannot find any unused trackbed to lay in some stabling sidings
Indeed. Surely there's land for sidings on the down side just east of the station? There were still some tracks there until relatively recently.
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,135
Indeed. Surely there's land for sidings on the down side just east of the station? There were still some tracks there until relatively recently.
Agree that seems an obvious location, but given the Pengam sidings are not being used, according to a post above, you’d have a tough job getting the cost approved. Indeed, that’s an argument against any new siding whilst existing capacity is unused.
 

Dai Corner

Established Member
Joined
20 Jul 2015
Messages
6,998
Agree that seems an obvious location, but given the Pengam sidings are not being used, according to a post above, you’d have a tough job getting the cost approved. Indeed, that’s an argument against any new siding whilst existing capacity is unused.
Well, somebody approved the £10m which started the thread .....
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,135
Well, somebody approved the £10m which started the thread .....
Wasn’t there a comment that the proximity of the proposed siding to the CAF works might give a hint as to the real motivation behind the proposal.
 

Dai Corner

Established Member
Joined
20 Jul 2015
Messages
6,998
Wasn’t there a comment that the proximity of the proposed siding to the CAF works might give a hint as to the real motivation behind the proposal.
Yes, from me. I speculated that it would make a useful test track and storage for newly assembled units on the 355 days a year it wasn't being used for its stated purpose. Perhaps a way of getting round the rules on stage aid for CAF?

I'm still struggling to understand how it can cost £10m to decide not to build a siding. No actual construction took place, did it?
 

Towers

Established Member
Joined
30 Aug 2021
Messages
3,020
Location
UK
I'm still struggling to understand how it can cost £10m to decide not to build a siding. No actual construction took place, did it?
Indeed, that does seem an enormous amount. Think how many 20mph road signs they could have manufactured with that! [sorry; humour mode OFF :D]

To swing back the 12 car 387 comments, I was under the impression that it had already been asserted thet the current GWR fleet status made the provision of that amount of spare stock rather unlikely anyway?
 

CardiffKid

Member
Joined
13 Feb 2011
Messages
1,081
Location
Cardiff
I'm still struggling to understand how it can cost £10m to decide not to build a siding. No actual construction took place, did it?
I don’t know and am only speculating but:

- was any land bought? If so add in legal fees
- how much design work by either civil servants and or transport engineers? £XX ph x by quite a few staff looking at options.
- site surveys etc
- fees to Network Rail to close the mainline for staff to access the proposed site etc
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,264
Location
West Wiltshire
I don’t know and am only speculating but:

- was any land bought? If so add in legal fees
- how much design work by either civil servants and or transport engineers? £XX ph x by quite a few staff looking at options.
- site surveys etc
- fees to Network Rail to close the mainline for staff to access the proposed site etc
Even if had 25 professionals charging hefty £250 per hour each for a bit of investigation / surveying etc, working for whole month, would only cost £1m

So to spend £10m would need nearer 100 people working 3-4 months at silly money, and nothing actually built, which just doesn't sound realistic to me.
 

Tomos y Tanc

Member
Joined
1 Jul 2019
Messages
918
Even if had 25 professionals charging hefty £250 per hour each for a bit of investigation / surveying etc, working for whole month, would only cost £1m

So to spend £10m would need nearer 100 people working 3-4 months at silly money, and nothing actually built, which just doesn't sound realistic to me.
Agreed. I'm guessing there's been some mis-communicaton somewhere, which doesn't exactly fill you with confidence.
 

Gostav

Member
Joined
14 May 2016
Messages
541
Even if had 25 professionals charging hefty £250 per hour each for a bit of investigation / surveying etc, working for whole month, would only cost £1m

So to spend £10m would need nearer 100 people working 3-4 months at silly money, and nothing actually built, which just doesn't sound realistic to me.
It seems typical that some people use their "professional fields" to commit corruption, usually by consulting firms.
 