• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

New Build Mk3s - £750k each.

Status
Not open for further replies.

rail-britain

Established Member
Joined
12 Aug 2007
Messages
4,102
If the train only needed two pantographs (rear in use), then why does it have THREE pantographs?
In the event of a pantograph failure the centre one becomes the power source for the other half, the failed pantograph remains out of use
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

ukrob

Established Member
Joined
15 Jan 2009
Messages
1,810
If the train only needed two pantographs (rear in use), then why does it have THREE pantographs?
In the event of a pantograph failure the centre one becomes the power source for the other half, the failed pantograph remains out of use

There isn't.

The diagram you yourself linked to quite clearly shows two, exactly the same as now. The additional transformer coach is no where near the middle either - I think you are talking nonsense now sorry.
 

Geezertronic

Established Member
Joined
14 Apr 2009
Messages
4,125
Location
Birmingham
I can't find much configuration info about the Pendolino lengthening but from what I can find it says the new coaches will be 31 pairs of an intermediate motor car and a transformer car, with "minor changes" to the configuration of each extended set including SDO controls.

http://www.railwaygazette.com/news/single-view/view/10/alstom-opens-new-pendolino-depot.html

Would be nice to have a bit more info about how they intend to lengthen the existing 9 car sets (such as where the new coaches will fit into the sets and other questions asked in this thread)
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,287
Would be nice to have a bit more info about how they intend to lengthen the existing 9 car sets (such as where the new coaches will fit into the sets and other questions asked in this thread)

Between First and Standard according to the diagram linked in post #24.

Now: DMfMfTfMfTMTMDM

After: DMfMfTfMfTMTMTMDM

Seems logical, as it keeps the usual M/T alternation through the train.
 
Status
Not open for further replies.

Top