• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Getting the most out of the new Alstom units for TPE?

Fokx

Established Member
Joined
19 Jul 2019
Messages
1,636
Location
Liverpool
The GBR imperative (by the time TRU is finished) will be to replace pure diesel services by cascaded bi-modes.
Diversionary routes have never counted in major fleet purchases, and don't sway business cases.
In any case, TP North should not need many diversions when TRU is done.
Yes but the reality is if TPE were to purchase purely EMUs rather than battery multi-modal units, there would be absolutely no service between the Norths largest cities because there would be no diversionary routes across the Pennines at all, in the event of engineering work, a suicide, track damage or overhead line damage.

That simply isn't acceptable for a modern railway.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

3RDGEN

Member
Joined
6 Mar 2023
Messages
660
Location
Hull
Yes the TPE 802s run on diesel (at least for part of the route) between Newcastle & Edinburgh due to insufficient power supply. Hopefully this is something that will be sorted out before the TRU is complete to allow for complete electric running from Liverpool to Edinburgh via the East Coast & TRU.
There's no plan to reinstate the Liverpool - Edinburgh TPE service via the ECML, they will terminate at Newcastle although to get units back to Edinburgh for maintenance there maybe an odd service that runs through.
What they should be doing is running the 802s to Hull/Saltburn/Scarborough. Newcastle trains only need to be simple, relatively uncomplicated, EMU's. No need to buy any BEMU's for TPE. As pointed out by Richard Bowker they are costing nearly £2m per vehicle (for 145 vehicles) more than recent Elizabeth line vehicles. Together with all the ongoing costs of trailing extra weight around, more complicated maintenance/ energy consumption etc.
This is TPE that bought the 397-probably the worst riding Inter City vehicles since the early mk1s-and the simlarly rough and seemingly unnecessary Nova 3s.
EMU's would be of no use to TPE North route due to the regular booked diversions via the Calder Valley and Wakefield / Castleford which would need to be 802's with nothing left for Hull/Scarborough/Saltburn services.
TP North should not need many diversions when TRU is done.
TP North has been doing Calder Valley/Castleford/Wakefield Kirkgate diversions for decades due to planned engineering works which will always be needed.
 

Fokx

Established Member
Joined
19 Jul 2019
Messages
1,636
Location
Liverpool
TP North has been doing Calder Valley/Castleford/Wakefield Kirkgate diversions for decades due to planned engineering works which will always be needed.
And Cheshire Lines for early morning and late evening Liverpool - Newcastle runs
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,832
Location
"Marston Vale mafia"
Yes but the reality is if TPE were to purchase purely EMUs rather than battery multi-modal units, there would be absolutely no service between the Norths largest cities because there would be no diversionary routes across the Pennines at all, in the event of engineering work, a suicide, track damage or overhead line damage.

That simply isn't acceptable for a modern railway.

Batteries also ease evacuation in the event of a wires down incident or other incident requiring power down and allow depots to be partly or completely unpowered and so much safer (and if the unit can't be moved provide enough power for HVAC and toilets to be maintained for a period of many hours). There's a good case to have a minimum of shunt batteries fitted to all EMUs for those reasons. So this is definitely a good thing.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,293
In support of @hwl, I think he means that repeated and frequent charge / discharge cycling of lithium-ion batteries, either on board or in the lonesdie traction system, will cause auicker degradation than seen in automotive. Even the highest mileage EVs will rarely do a full charge cycle more than once a day on average; that imolies 50k miles pa or more. For trains doing the duty cycles we’ll see on TPE, Northern, GER etc you could easily be seeing 4-10 full cycles a day, which will need very careful management. And preferably LFP or LiTO chemistry.
Exactly. The battery duty cycle outside of rail that is most similar to BEMUs is heavy haul mining trucks (400tonnes loaded) which average 7 cycles per day and are all LTO territory. The freight loco trials in Australia with LFP have turned out to be a bit of a flop with the choice of LFP being part of the problem (this needs high recovery from regen and this was/can't happen in practice without changes). The potential future Downer trial with a mix of LTO/LFP might be slightly more useful.
Tesla Robo-taxis are only designed for 12hours a day of use and not all in one go either.

Unfortunately Alstom have gone for NMC for TP and are almost certainly their viewpoint that something vastly better will be available at the time the first battery change (probably about 5 minutes after the inclusive maintenance contract expires!
 

stevieinselby

Established Member
Joined
6 Jan 2013
Messages
1,724
Location
Selby
Yes but the reality is if TPE were to purchase purely EMUs rather than battery multi-modal units, there would be absolutely no service between the Norths largest cities because there would be no diversionary routes across the Pennines at all, in the event of engineering work, a suicide, track damage or overhead line damage.

That simply isn't acceptable for a modern railway.
And yet that is and has been the reality for many mainlines, whether because they rely on electrification (how did the ECML cope pre-Azuma? There are plenty of points on the WCML without electrified alternatives) or because there simply aren't any diversionary routes.

At the moment, there is no realistic prospect of electrification reaching Saltburn or Scarborough, so TPE will be running some battery units, even if the Newcastle service goes to full EMU. That would enable them to be used on diversionary routes to maintain a service across the Pennines, even if passengers from Newcastle had to change to York.

Perhaps a better solution is to work towards getting the diversionary routes electrified as well – Calder Valley is a heavily used line that would appear to merit it.
 

8ace

Member
Joined
25 Dec 2019
Messages
339
Location
Brighton
LTO - Lithium Titanate Oxide
LFP - Lithium Iron Phosphate
NMC - Nickel Manganese Cobalt

I had to look it up so thought I might as well share it :)
 

NCT

Established Member
Joined
18 Apr 2025
Messages
2,334
Location
London
Yes but the reality is if TPE were to purchase purely EMUs rather than battery multi-modal units, there would be absolutely no service between the Norths largest cities because there would be no diversionary routes across the Pennines at all, in the event of engineering work, a suicide, track damage or overhead line damage.

That simply isn't acceptable for a modern railway.

How's this different to when something happens at Hemel Hempstead?
 

Fokx

Established Member
Joined
19 Jul 2019
Messages
1,636
Location
Liverpool
How's this different to when something happens at Hemel Hempstead?
Because the diversions between Liverpool and York are already well used, pre-trained and actionable already.

Can we now stick to the topic and not argue as to why fictional EMUs should have been ordered ?
 

Grumpy

Established Member
Joined
8 Nov 2010
Messages
1,322
That actually wrong as there's a large chunk of Mossley that isn't being electrified.
If so then you may be right. But Network Rail's own site says "We’re electrifying the whole route to enable greener trains to run".
 
Joined
8 Feb 2021
Messages
1,062
Location
Manchester
Unless plans have changed/do change Mossley will be ‘electrified’ - but the wires will be a permanently earthed section. So yes wires, but no current running through them
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,965
Presumably that's just to avoid expensive pantograph damage if it isn't dropped in time?

Typically a short permanently earthed section is cheaper than two end of run anchors plus a 25kV cable between the two ends somehow.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,760
Location
Nottingham
Simpler all round just to keep the pan up, unless the clearance is so small for that. At Mossley the issue is electrical clearance not structural clearance.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,889
And yet that is and has been the reality for many mainlines, whether because they rely on electrification (how did the ECML cope pre-Azuma?
The same way it copes now: by using its diesel trains in a way that covers the gap. The true electro-diesel equipped Azuma fleet isn’t much bigger than the old HST fleet. And in the old days the electric trains had a standard coupling interface that allowed them to be hauled and heated by diesel locomotives.
 

LittleAH

Established Member
Joined
24 Oct 2018
Messages
1,214
The GBR imperative (by the time TRU is finished) will be to replace pure diesel services by cascaded bi-modes.
Diversionary routes have never counted in major fleet purchases, and don't sway business cases.
In any case, TP North should not need many diversions when TRU is done.
The Newcastle-Edinburgh local service is also a complete waste of 802 capability.
All lines require diversionary route knowledge. Takes one incident at Garforth or Greenfield post TRU and then services cannot traverse the Pennines.
 

James90012

Member
Joined
21 Sep 2016
Messages
188
But wouldn't those diversionary routes be within the capability of the Alstom BEMUs? If something has really gone wrong then the service would need to be thinned anyway.
 

quantinghome

Established Member
Joined
1 Jun 2013
Messages
2,916
But wouldn't those diversionary routes be within the capability of the Alstom BEMUs? If something has really gone wrong then the service would need to be thinned anyway.
Exactly this. I hadn't thought about this issue, so thank you for raising it.

In summary: The post-TRU Transpennine fast and semi-fast service is 6 trains per hour. It would be completely impossible for the Calder Valley diversionary route could take on that additional number of trains. It couldn't even take on the 4tph which the Alstom BEMUs are planned to cover. So we can dismiss the diversionary route argument as a reason for not replacing the current 802s with electric-only trains.
 

NCT

Established Member
Joined
18 Apr 2025
Messages
2,334
Location
London
Passengers can always divert themselves, as is usually the case when the southern end of the WCML goes down. TransPennine passengers wouldn't been particularly hard done by.
 

YorkRailFan

Established Member
Joined
6 Sep 2023
Messages
3,452
Location
York
Passengers can always divert themselves, as is usually the case when the southern end of the WCML goes down. TransPennine passengers wouldn't been particularly hard done by.
The problem with that is the diversionary routes like the Calder Valley trains are often overcrowded anyway without TPE passengers. Trying to get TPE passengers onto what are already busy services is far from a good idea. Especially when TPE can run trains via the Calder Valley to not overwhelm the regular Northern services.

Yes I know this is what happens when the ECML has engineering works and people get the already busy MML with EMR. The difference here is that TPE can (and do) run trains when there's a closure of the Transpennine Main Line such as the Calder Valley route. LNER (and also Hull Trains) have been trialling limited services into St Pancras but that is restricted due to capacity on the MML and a quite a lot of people find the coach alternative via Bedford unattractive as evidenced by the overcrowding on EMR services on top of the usual capacity issues. The Calder Valley line has capacity for TPE diversions and drivers sign the route so they might as well use it!
 

quantinghome

Established Member
Joined
1 Jun 2013
Messages
2,916
The Calder Valley line has capacity for TPE diversions and drivers sign the route so they might as well use it!
Agreed. However, while it has capacity for *some* TPE diversions it certainly couldn't handle an additional 6 trains per hour (the post-TRU TPE service). The current diversions manage about 2 tph (3, if you count the TPE trains which stop at Hebden Bridge and other Calder valley stations). So the maximum possible diversionary service could easily be covered by the Alstom BEMUs.
 
Last edited:

3RDGEN

Member
Joined
6 Mar 2023
Messages
660
Location
Hull
Agreed. However, while it has capacity for *some* TPE diversions it certainly couldn't handle an additional 6 trains per hour (the post-TRU TPE service). The current diversions manage about 2 tph (3, if you count the TPE trains which stop at Hebden Bridge and other Calder valley stations). So the maximum possible diversionary service could easily be covered by the Alstom BEMUs.
The BEMU's could cover the diversions but that would mean the Newcastle services been terminated at York/Leeds as they would be EMU's only which isn't the normal practice, the Scarborough and Hull services are usually cut back to York and Leeds during engineering works giving priority to the Newcastle/Redcars. You couldn't put the BEMU's on the Newcastle services due to the 110mph limit and Newcastle crews may not sign the BEMU's as they will be 802's only in normal service.
 

quantinghome

Established Member
Joined
1 Jun 2013
Messages
2,916
The BEMU's could cover the diversions but that would mean the Newcastle services been terminated at York/Leeds as they would be EMU's only which isn't the normal practice, the Scarborough and Hull services are usually cut back to York and Leeds during engineering works giving priority to the Newcastle/Redcars. You couldn't put the BEMU's on the Newcastle services due to the 110mph limit and Newcastle crews may not sign the BEMU's as they will be 802's only in normal service.
Come on, these are hardly dealbreakers.

The 110mph limit costs all of 2.5 minutes from York to Darlington. If it's that big a deal then skip Darlington, Durham or Chester-le-Street.

As happens in many other parts of the network anticipating just such eventualities, an occasional BEMU would be scheduled for Newcastle to maintain crew competency.
 

Top