• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

My ideas for London - Kent timetable changes

Status
Not open for further replies.

43074

Established Member
Joined
10 Oct 2012
Messages
2,253
An impressive set of ideas 465fan, however I have the following observations.

3.2 Kings Lynn
Kings Lynn receives an hourly service to London Kings Cross. As Kings Lynn is not a viable option for Thameslink route services, I would propose that the current hourly “semi-fast” service from London Liverpool Street to Cambridge be extended to Kings Lynn, calling additionally at Waterbeach, Ely, Littleport, Downham Market and Watlington. This would allow the incumbent Greater Anglia franchise to bring this route ‘in house’. Greater Anglia currently use new (and passenger friendly) Class 379 multiple units for peak hour services from London Liverpool Street to Kings Lynn, and off peak services would be easily integrated.

The usage of the Kings Lynn to Cambridge & Kings Cross service fully justifies the operation of a fast service from to Kings Cross, and a 1/2 hourly fast service runs from Cambridge. Campaigners are calling for a 1/2 hourly service from Kings Lynn to Kings Cros when Ely North works have been completed, and although not the most populous of areas, the route does provide important links to London, particularly form Ely where at 07:30 every morning there is a throng of commuters bound for Kings Cross. The route to LIverpool Street in it's current form is too slow to offer direct services. The Networker units currently used on the route are more than suitable, although need mods to bring them up to DDA spec. The acceleration of these trains is virtually unrivalled, making them suitable for the Southern part of the East Coast Main Line.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,057
Location
Reston City Centre
Reigate and Tonbridge are possible candidates for the 4tph from Welwyn GC with Thameslink, or is it worse than 8-car?

Then again that's another 4tph Thameslink service made up of 2+2 (is Bedford - Brighton, with the exception of different stopping patterns, the only actual 4tph service?) - though less galling than say, Three Bridges/Horsham or Orpington/Sevenoaks, where there's a complimentary 2tph Victoria service with the same service pattern from East Croydon/Shortlands to Three Bridges/Orpington. Just make it a consistent 4tph service to Three Bridges and Orpington with 2tph Victoria service to Horsham and Sevenoaks instead of the everywhere-to-everywhere-else mush that is making a right pigs ear of the rail network in the SC/SE region.

Agreed - I'd like to see Thameslink be the catalysts for a re-organisation of services south of the Thames to get away from the muddle of places having more than one London terminus/ conflicting movements...

...whilst there will be a lot of places wanting to be part of the new Thameslink map (especially if it means a direct service to somewhere like Gatwick) I'd prefer Thameslink to stick to being a frequent service (e.g. 4/6/8tph) to a few key corridors rather than a muddle of routes.

As for the arguments in this thread about Kent - are there still the paths spare into London that used to have the "fast" Kent services (before they were replaced by extensions of the semi-fast services)?
 

JamesRowden

Established Member
Joined
31 Aug 2011
Messages
1,762
Location
Ilfracombe
As for the arguments in this thread about Kent - are there still the paths spare into London that used to have the "fast" Kent services (before they were replaced by extensions of the semi-fast services)?

I think that all of the Orpington to Tonbridge paths are presently all being used. The space left by the withdraw of one of the three Ashford services was taken by a service to Tunbridge Wells that replaced the Tunbridge Wells to Gatwick service.

The double tracked section between Orpington and Tonbridge presently has the off-peak serices shown below (with stops between Orpington and Tonbridge shown):

Charing Cross - Sevenoaks (Orpington, Chelsfield, Knockholt, Dunton Green, Sevenoaks) [2tph inner suburban]

Charing Cross - Tunbridge Wells (Orpington, Sevenoaks, Hildenborough, Tonbridge) [2tph outer suburban]

Charing Cross - Hastings (Orpington, Sevenoaks, Tonbridge) [1tph semi-fast south of Tonbridge, 1tph stopping south of Tonbridge]

Charing Cross - Kent Coast (Sevenoaks, Tonbridge) [2tph stopping south of Tonbridge]
 
Last edited:

465fan

On Moderation
Joined
26 Jul 2009
Messages
503
Location
Bexley
An impressive set of ideas 465fan, however I have the following observations.



The usage of the Kings Lynn to Cambridge & Kings Cross service fully justifies the operation of a fast service from to Kings Cross, and a 1/2 hourly fast service runs from Cambridge. Campaigners are calling for a 1/2 hourly service from Kings Lynn to Kings Cross when Ely North works have been completed, and although not the most populous of areas, the route does provide important links to London, particularly form Ely where at 07:30 every morning there is a throng of commuters bound for Kings Cross. The route to LIverpool Street in it's current form is too slow to offer direct services. The Networker units currently used on the route are more than suitable, although need mods to bring them up to DDA spec. The acceleration of these trains is virtually unrivalled, making them suitable for the Southern part of the East Coast Main Line.

I wouldn't wish to lie to you, I fully agree that the services from Kings Lynn to London Kings Cross are both well used and exceptionally important. The problem you have, however, is pathing services from Kings Lynn to Kings Cross when the East Coast Main Line will quite literally go to the Thameslink side, and it has been said that Kings Lynn cannot form part of the Thameslink network. Even if it could, considerations have to be made for growing centres which would proclude non stop services - Royston, Letchworth, Stevenage, Welwyn. Similarly, the local services from "Huntingdon and below" need improvement - they're always wedged.

I guess what I'm suggesting is four trains per hour from London Liverpool Street to Cambridge: two calling at Stratford, Tottenham Hale, Bishops Stortford and Cambridge (which could easily go to Kings Lynn), and two which would call at Tottenham Hale, Cheshunt, Broxbourne, Roydon etc - leaving two Stansted Express services in each hour.

I guess the point is that you could provide a 4 or 8 car Class 379 service every half hour which would actually run to Tottenham Hale (Victoria line, Kings Cross etc) and Stratford (Jubilee, Central, Crossrail) as well as Liverpool Street (highly useful for a growing commuter market).
--- old post above --- --- new post below ---
Agreed - I'd like to see Thameslink be the catalysts for a re-organisation of services south of the Thames to get away from the muddle of places having more than one London terminus/ conflicting movements...

...whilst there will be a lot of places wanting to be part of the new Thameslink map (especially if it means a direct service to somewhere like Gatwick) I'd prefer Thameslink to stick to being a frequent service (e.g. 4/6/8tph) to a few key corridors rather than a muddle of routes.

As for the arguments in this thread about Kent - are there still the paths spare into London that used to have the "fast" Kent services (before they were replaced by extensions of the semi-fast services)?

Again, sensible. Running Thameslink services in addition to services from London Bridge is wasteful - especially considering the thoughts and feelings of Mr. McNulty. London Bridge's off peak "outer suburban" network comprises Reigate, Tonbridge and Horsham. What is the point in running these trains, and then ignoring places like Horsham from the network, by running an extra two useless trains per hour to Three Bridges?! This is why I have considered the 8 car off peak services which would divide and head to Tonbridge (half hourly) and Reigate (half hourly). This would also be likely to bring in new business for the likes of First Great Western on the North Downs. People suggesting that a Cross Country or other route from Tonbridge to Reading - absolutely ridiculous. Simply providing a half hourly North Downs service, and a half hourly Redhill - Tonbridge service (with new rolling stock) should be adequate catalyst for growth of that market.

The point of this is rather simple: The new Thameslink services will compliment what we now know as Southeastern and Southern because the entire thing will be one franchise. Sensible, I do believe. I would, however, suggest that Thameslink 'branch out' to really maximise the benefits for all, within reason. Four trains per hour to Dartford, Four to Brighton, Four via Redhill, Four via Catford. It's all "round", and whilst some destinations may be tweaked, the train crew in the local area will sign the traction and the route to permit it.

As for the routes through Kent - you can ably path four trains per hour fast from Victoria to Bromley South via Herne Hill, and four trains per hour fast from Victoria to Bromley South via Catford, whilst still allowing freight to 'happen' from the Channel. My ideas take into consideration local needs, improvements, technical issues and infrastructure constraints. Each point I have made carefully intertwines with another.
--- old post above --- --- new post below ---
I think that all of the Orpington to Tonbridge paths are presently all being used. The space left by the withdraw of one of the three Ashford services was taken by a service to Tunbridge Wells that replaced the Tunbridge Wells to Gatwick service.

The double tracked section between Orpington and Tonbridge presently has the off-peak serices shown below (with stops between Orpington and Tonbridge shown):

Charing Cross - Sevenoaks (Orpington, Chelsfield, Knockholt, Dunton Green, Sevenoaks) [2tph inner suburban]

Charing Cross - Tunbridge Wells (Orpington, Sevenoaks, Hildenborough, Tonbridge) [2tph outer suburban]

Charing Cross - Hastings (Orpington, Sevenoaks, Tonbridge) [1tph semi-fast south of Tonbridge, 1tph stopping south of Tonbridge]

Charing Cross - Kent Coast (Sevenoaks, Tonbridge) [2tph stopping south of Tonbridge]

The Orpington to Sevenoaks route is the key: A two track section which needs to be served on a local and 'through' basis. Suppose it might be comparable to the route from Doncaster - Wakefield - Leeds.

This is why I have carefully considered how many trains you need: two services from Charing Cross to Ashford, two Thameslink services to Tunbridge Wells, and two Charing Cross to Hastings moves. The Thameslink services would call at Chelsfield (a growing station, especially in peak) and the local service would run to London Cannon Street via Lewisham (through journeys from Sevenoaks once more to that station).
 

Sparks169

Member
Joined
29 Apr 2012
Messages
39
1 The Thameslink Programme
1.2 Caterham, Tattenham Corner and East Grinstead
Caterham and Tattenham Corner are not, considering their passenger usage (and proximity to other rail routes), suitable Thameslink destinations. Their off peak passenger usage is exceptionally low comparative to a number of alternatives across the South East. I would, however, provide East Grinstead with two trains per hour from the Thameslink route all day, as stations such as Sanderstead, Upper Warlingham and Oxted are experiencing a rapid rise in passenger numbers. Platform lengths also limit the length of trains.

This being my general area, I will agree that in the general picture Caterham and Tattenham lines passenger usage at off-peak is not worthy of a valuable Thameslink service as it is, and as you say the East Grinstead branch particularly the three stations you mention are increasing in usage.
A local observation however is that a number of passengers who used to use the Caterham branch around the Whyteleafe/Kenley and Purley Oaks/South Croydon areas have shifted to use the East Grinstead branch at both Upper Warlingham and Sanderstead which have almost double the footfall now in comparison.

The main reason I can see being the difference in journey time particularly at off-peak but also during the peak. The move to splitting and attaching Caterham/Tattenham trains during peak time over the past few years has in reality increased the peak journey time by at least 10 minutes at best and includes a rather thankless wait at Purley while this takes place.

Meanwhile the East Grinstead branch has had the benefit of increased capacity to 12 coach trains but no sacrifice of journey time. So journey times at peak for the Caterham branch is around 35-38 minutes at best and around 25-28 minutes average from Upper Warlingham/Sanderstead.
Then the difference off-peak is quite substantial with an average journey time from Caterham/Whyteleafe/Kenley of 50 minutes - 1 hour, as opposed to around 30 minutes from the local EGR line stations.

This difference makes Upper Warlingham and Sanderstead more attractive to passengers, however what is obvious is that this line despite increased capacity is becoming more and more crowded and has standing passengers north of Oxted.

So thinking a bit more strategically, improving journey times on the Caterham branch either by providing the proposed Thameslink service or simply replacing at least 2 of the 4tph stopping services on the branch with faster services could encourage passengers to even out between the two lines and actually use the capacity which is currently available in this area rather than piling more and more capacity improvements on one line, which in turn encourages yet more people to cram on.

This would surely cost less than further capacity enhancements which may be required in future on the EGR branch and ease the crowding at peak times and spread the loadings more off-peak.
 
Status
Not open for further replies.

Top