That's an average consumption of 33.7kWh/min = 2.025MW.
So 5kW per car. Thanks.
OK. So if you won't let me have diesel engines, let's try a 9-car all battery Hitachi IET, the
80x-B
- 2 x driving cars with 6MW transformer under the floor and three pantographs for use at stations with 25kV conductor bars sufficiently thick to deliver 6MW to each end car.
- 7 x Battery packs rated at 700kW / 550kWh. Each weighing the same as an 80x diesel GU.
- Hotel power = 5 x 9 = 45kW
- Maximum power output 4.9MW,
- Total battery capacity = 3.85MWh. At WCML record attempt consumption, that's 1.9h = 114 minutes endurance.
Assuming the MML north of Wigston and the Cross Country route both use power at the same 2MW average rate as a Pendolino to Glasgow:
- Wigston to Sheffield (67 mins) will use 59% of the battery. e.g. 90% to 31%. Ten minutes recharging at 12MW at Sheffield will put back 2MWh (52%). So the return journey will get back to Wigston with 24% charge left. If Sheffield grid supply fails, then the return journey will have to be in limp home mode (but wiring Derby station too would fix that).
- On the Cross Country route, Proof House Junction near New St to South Kirby Jn near Wakefield (89 mins) will consume 78% of the battery. e.g. 90% to 12%, without recharging at all. Five minutes dwell at Sheffield (or Derby if wired) would give a much bigger reserve. (Or you could wire Tamworth, fed from the WCML grid feeder point already there.)
In practice, I'd expect MML and XC consumption to be less than a Pendolino being driven to the limit, but that's the best I can do for now without more precise data.