Marshlink Electrification + HS1 extension: Is it happening?

Status
Not open for further replies.

PGAT

Established Member
Joined
13 Apr 2022
Messages
2,128
Location
Selhurst
There were plans to extend the HS1 network from Ashford to Hastings following the existing Marshlink line. This would require extra rolling stock, as well as electrification of the entire line up to Hastings and remodelling Ashford International station to allow trains to connect to the branch.

Is it feasible? Is it happening? I haven’t found any threads about this topic which is why I am posting here.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,342
Is it feasible?
No
Is it happening?
No
I haven’t found any threads about this topic which is why I am posting here.
The words of 'Bald Rick' are in these two postings regarding through workings from HS1 to the Hastings route. Basically, there is no route from the HS1 line across the western end of Ashford Station to join the Hastings line and no room at the east end - https://www.railforums.co.uk/threads/171s-leaving-southern.218587/page-4#post-5185868 and https://www.railforums.co.uk/thread...er-marshlink-electrified.217681/#post-5147180

A bit more here - https://www.railforums.co.uk/thread...ent-from-modern-railways.211625/#post-4879570

As for electrification, past threads have indicated that battery power is more likely and feasible for the gap between Ashford and Ore, however there appears to be no proposal / action on this - https://www.railforums.co.uk/thread...ification-projects.225689/page-7#post-5443120
 
Last edited:

Dr Hoo

Established Member
Joined
10 Nov 2015
Messages
5,672
Location
Hope Valley
Exactly. There was never a thing that could honestly be described as a “Plan” (which would imply designs, costings, timescales, funding, sponsorship and so on).
 