It wasOh man that must have been spectacular up Freshfield Bank.
Yes - it was installed for the Santa Specials in November 2024 so the Y Set (all non-corridor) could have an extra 4-wheel coach on the north end. It also now allows us to fully accommodate 6 Mk1s, which is very useful at galas.There's a temporary wooden extension at Sheffield Park by the demonstration signal box which seems to bring the length up to 6 coaches. No ramp though (tut tut)
The annoying thing for us is that it puts the TAC (Train Arrived Complete) plunger in a very awkward position to reach - you either have to crouch down on the platform extension or walk down behind it!