Timed for 110mph, so running on diesel?
Timed as an HST at 110mph, so HST-110 timing load is presumably being used to provide a complete set of SRTs and not necessarily an indication of whether it will operate in electric or diesel.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,714
I didn't comment on the SRTs.
Doesn't matter, the path used whatever set of SRTs were considered sutiable. Someone could have timed it as a charter with a class 47 on the front if it did the job. If it was wired they could have used electric freight times if it was a right side failure even if it ran diesel.
 

Class15

Established Member
Joined
30 Dec 2021
Messages
4,163
Location
North London or Mildmay line
Doesn't matter, the path used whatever set of SRTs were considered sutiable. Someone could have timed it as a charter with a class 47 on the front if it did the job. If it was wired they could have used electric freight times if it was a right side failure even if it ran diesel.
You can of course run electric trains in diesel paths (looking at Freightliner).
 

bunnahabhain

Established Member
Joined
8 Jun 2005
Messages
2,277
Due to platform limitations at St Pancras International suspect any Lner service will probably terminate at Bedford for Thameslink connections.
Correct.

I believe approximately 7 per day, hopefully connecting into Thameslink services as they have the capacity to eat people. Last I heard the timings needed tweaking to achieve this as they would be dropping into an EMR Connect service which would already be busy.

== Doublepost prevention - post automatically merged: ==

Care to explain which posts are false and why?
They aren't running to London, only as far as Bedford.
 

43 302

Established Member
Joined
25 Oct 2019
Messages
1,730
Location
London
Doesn't matter, the path used whatever set of SRTs were considered sutiable. Someone could have timed it as a charter with a class 47 on the front if it did the job. If it was wired they could have used electric freight times if it was a right side failure even if it ran diesel.
I do believe you're now arguing with yourself.
 

Vexed

Member
Joined
12 Jan 2020
Messages
663
Location
Herts / Hants
The rest of the paths are now in as follows:
5Q12 0011 Bedford P1 to Bedford P3 via Bedford North Junction 0018
5Q13 0039 Bedford P3 to Bedford P2 via Bedford North Junction 0055
5Q14 0108 Bedford P2 to Wellinborough P3 to Kettering P2 0154
5Q15 0209 Kettering P2 to Leicester P1 (reversal just south of Kettering to swap to Down Fast, I'm unsure why Kettering North Jn is unavailable for DS -> DF?) 0240
5Q16 0251 Leicester P1 to Doncaster 0427

The southbound run that was already in (5Q11) covered Leicester P4, Kettering P1 and Wellinborough P4. With extended dwells I would assume some platform train interface testing/checks are taking place, things like making sure lamp posts aren't in the way of wheelchair ramps I guess?
 

99009

Member
Joined
4 Apr 2025
Messages
317
Location
Chesterfield
Eventually the RTT schedules will be inaccessible to some people, so given that it hasn't been stated in this thread yet, the unit involved in the testing was 800104.
 