Not really, but it does make any re-opening project that much more expensive for the diversions and rehabilitation of the old tunnels for use by the grid. Of course, that is probably National Grid's reasoning for putting the cables in to the newer tunnel in the first place - so that they dont have to spend the money on the old tunnels.
Essentially, the existing power cables at Woodhead in the original single track North tunnel were life-expired and in need of replacing, the power supply cannot be switched off for years at a time until the new work is finished, and as it wasn't considered practicable to make use of the adjacent single track South tunnel (due to collapses) which only left the 1953 "new" double track tunnel for installing the replacement power cables. When the new power cables are in place, it won't really be possible to have an operational railway track running over them due to lack of maintenance access. This then just leaves the Victorian tunnels as available for possible railway traffic in the future, both of which are unsuitable for electrification in their current state, and one of which is in very poor condition. Never say never, but as I stated previously, this, in my opinion, effectively rules out the chances of the Woodhead railway line ever re-opening anytime soon(!)