I'm opening a right can of worms with this, but the current closure for engineering work gave me the idea. The RRBs seem to be traversing the route at a comparable journey time to the branch service, and slightly faster than an all stations pattern train service (24 mins RRB, vs 26-29 mins train). Normally buses would be much slower, but in this case I suspect the Coombe Jct reversal and low speed limit across the branch make the bus slightly faster. If the line was therefore closed with a bus service taking over that had a partnership/connection promotion, would this do a better job at moving passengers?
Meanwhile a cycle path taking over the trackbed through the valley could be very attractive for cyclists, who avoid the very hilly roads and have a very scenic path to enjoy.
I suspect the main problems are whether summer demand is harder to manage in this way, plus of course how difficult politically closing lines is.
Meanwhile a cycle path taking over the trackbed through the valley could be very attractive for cyclists, who avoid the very hilly roads and have a very scenic path to enjoy.
I suspect the main problems are whether summer demand is harder to manage in this way, plus of course how difficult politically closing lines is.