Could any infrastructure people here help out someone who takes a not very well informed interest in civil engineering and service improvement?
I want to know how much disruption is involved in, and how long it takes, to qaudruple a line? How much of a possession is lost setting up and clearing the line? How much track could be replaced in an overnight possession? What is usually the limiting factor on line speed? Can the point where tracks diverge (that is, the 6 foot becomes the ten foot) to go around a platform be moved back (away from the existing platform to allow platform extension) in one overnight possession?
Thanks in advance.
I want to know how much disruption is involved in, and how long it takes, to qaudruple a line? How much of a possession is lost setting up and clearing the line? How much track could be replaced in an overnight possession? What is usually the limiting factor on line speed? Can the point where tracks diverge (that is, the 6 foot becomes the ten foot) to go around a platform be moved back (away from the existing platform to allow platform extension) in one overnight possession?
Thanks in advance.