Bletchleyite
Veteran Member
GWR, TfW Rail, Scotrail, Greater Anglia, EMR anyone? All have a similar mix of services and nobody complains.
Indeed GWR is a very good example of why a TOC having both types of service is a good idea.
GWR, TfW Rail, Scotrail, Greater Anglia, EMR anyone? All have a similar mix of services and nobody complains.
Indeed GWR is a very good example of why a TOC having both types of service is a good idea.
There are 3 different t&c’s amongst Northern’s staff so no different (ex RRNE, ex NWRR and ex TPE). A 4th won’t make much difference.Although GWR services into Paddington are (or at least were) two separate travk access contracts, and separate terms and conditions for the drivers / conductors split between Thames Valley and long distance.
There are 3 different t&c’s amongst Northern’s staff so no different (ex RRNE, ex NWRR and ex TPE). A 4th won’t make much difference.
I don’t disagree, my point was more than merging the operations doesn’t necessarily bring traincrew efficiency.
Fair enough. My point was more that the GWR service can for example be marketed as a whole, and things like holding connections for the mainline (which does happen, whether it's meant to or not) are easier to arrange.
It wouldn't really work for Avanti West Coast + connecting services as that's all rather more complex at both ends, but for Northern+TPE it would. And Northern might be less of a target for cuts etc because it would look less of a basket case. Indeed, wasn't the split originally designed for Northern (the SercoNed franchise) being the target of major cuts including potential line closures which didn't happen?
Well the last sentence doesn’t stack up. York crews sign both 802’s and Mk 5 sets as well as 185’s.