I thought the Train Supply Agreements were only for the IEP with non IEP 80xs on a conventional lease?- they are all Train Supply Agreements, which is how Hitachi do their business with the 80x fleets.
I thought the Train Supply Agreements were only for the IEP with non IEP 80xs on a conventional lease?- they are all Train Supply Agreements, which is how Hitachi do their business with the 80x fleets.
Assuming that XC take on the 221 displaced from Avati West Coast and assuming that my maths is correct that will give XC from 2022
34x 220 (4 car)
44x 221 (5 car with some 4 car)
Also from 2022 EMR will start to receive 33x 5 car 810 which will displace 222's comprising 6x 7 car, 17x 5 car and 4x 4 car, some of which could also go to XC.
If completion of MML electrification through to Nottingham, Derby and Sheffield is authorised then would it not make sense to casecade those Bi-modes to XC with a new order of straight electrics for MML rather than removing the engines from the bi-modes. The 33 810's could be lengthened with intermediate coaches to match the capacity of the 22x that run doubled up?
If completion of MML electrification through to Nottingham, Derby and Sheffield is authorised then would it not make sense to casecade those Bi-modes to XC with a new order of straight electrics for MML rather than removing the engines from the bi-modes. The 33 810's could be lengthened with intermediate coaches to match the capacity of the 22x that run doubled up?
Seeing as the 'straight electrics' ordered would just be 810s without engines fitted, what's the point in cascading them away? If XC were to get new bimodes, it makes more sense for them to get the de-facto standard 26m long ones rather than the bespoke MML units?
All the LNER, Transpennine, and GWR bits will be cleared for 26m though??Route clearance is the only potential problem with 26m units for XC, given the MML and its associated routes will only be cleared for 23m AT300 units rather than 26m ones.
All the LNER, Transpennine, and GWR bits will be cleared for 26m though??
I thought the Train Supply Agreements were only for the IEP with non IEP 80xs on a conventional lease?
But the Bespoke MML units are designed to offer performance more like 22x on Diesel and given the still likely long Diesel sections on XC when obtained would likely be the better choice and possibly a bit easier from a route clearance perspective as already suggested, whether ordered new or cascaded.Seeing as the 'straight electrics' ordered would just be 810s without engines fitted, what's the point in cascading them away? If XC were to get new bimodes, it makes more sense for them to get the de-facto standard 26m long ones rather than the bespoke MML units?
You can compulsarily purchase any property, including in this case share certificates. (We don't traditionally refer to it as compulsory purchase, but it is literally compulsory purchasing!)It absolutely does not! Firstly the phrase 'compulsory purchase' normally relates to land and buildings and there are definite laws and procedures attached, not least to avoid ECHR issues (Protocol 1 Article 1).
Secondly that is not what is at issue here as what you are describing is actually forced nationalisation. Once again the ECHR applies (same protocol/article). There was much legal investigation done when Labour under Jeremy Corbyn proposed major nationalisation. See for example:
Gilt borrowing costs would not change - they are fixed for the duration at the moment the gilts are issued.Do you realise that HMT does all of its calculations in fixed year pounds using net present value calculations (i.e a pound spent in the future is worth less than a pound spent now). The precise detail of the contract and how leasing costs change over time versus any borrowing costs change will form a very complicated calculation to see if any saving would actually be made by your proposal.
Again I am probably being dim, but paying that market value could still be less than Agility’s owners get by keeping their company?
Seeing as the 'straight electrics' ordered would just be 810s without engines fitted, what's the point in cascading them away? If XC were to get new bimodes, it makes more sense for them to get the de-facto standard 26m long ones rather than the bespoke MML units?
Route clearance is the only potential problem with 26m units for XC, given the MML and its associated routes will only be cleared for 23m AT300 units rather than 26m ones.
All the LNER, Transpennine, and GWR bits will be cleared for 26m though??
But the Bespoke MML units are designed to offer performance more like 22x on Diesel and given the still likely long Diesel sections on XC when obtained would likely be the better choice and possibly a bit easier from a route clearance perspective as already suggested, whether ordered new or cascaded.
...But not the MML and what about the WCML or south of Reading?...
Route clearance is the only potential problem with 26m units for XC, given the MML and its associated routes will only be cleared for 23m AT300 units rather than 26m ones.
But the Bespoke MML units are designed to offer performance more like 22x on Diesel and given the still likely long Diesel sections on XC when obtained would likely be the better choice and possibly a bit easier from a route clearance perspective as already suggested, whether ordered new or cascaded.
To save having to remove the diesel engines after only a few years of use
A fair point, although I thought the 26m long AT300 was gauged similarly to the 23m mark 3? Part of the reason for the long overhang on them, and why the only issue that cropped up with IEP clearance (that I remember) was a single tunnel in Wales used for summer only extensions?
Interesting, I wonder how they will do maintenance for the Avanti units as they are getting joint maintained by Hitachi and Alstom.They are leased but it's not a conventional arrangement of dry, soggy or wet - Hitachi have to supply a daily quota of diagrams, same as the IEP sets. They are fully responsible for the maintenance of the sets. The contracts mimic the IEP TARA arrangements but without some of the silliness.