You're really presuming an extension soon considering the current delays?
No, but if you are spending a mass of money building a new Slade Green you don’t want to be building it on top of the Crossrail route (which is already passively protected isn’t it?).
Also a new Slade Green wouldn’t be operational for a few years, by which time everything will be different
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

hwl

Established Member
Joined
5 Feb 2012
Messages
8,256
Hoo Junction seems a long way out, whereas Slade Green seems a near perfect location to an amateur.
I guess the issue would be trying to keep Slade Green open during expansion or finding temporary stabling somewhere, and also leaving provision for Crossrail to get through the site at some point
A bit more difficult in practice. The siding opposite and the southerrn shed are 10 car max so the extension would need to be length wise by quite a bit to cope with both going upto more 12car as well as sideways to the east and this bring big issues with junctions and then there is Crossrail extension provision...
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,256
No, but if you are spending a mass of money building a new Slade Green you don’t want to be building it on top of the Crossrail route (which is already passively protected isn’t it?).
Also a new Slade Green wouldn’t be operational for a few years, by which time everything will be different

Depot space isn't the only issue they are very short of stabling too and this can't be address just by works at Slade Green.
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
Crossrail at OOC is Single ended. You could put a big single ended shed in the fields to the East of the current Slade Green.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,256
Crossrail at OOC is Single ended. You could put a big single ended shed in the fields to the East of the current Slade Green.
There is planning permission in progress for a large logistics park with rail access "Howbury Park" on the fields so there insn't a huge amount of extra width for more rail stuff just 5-6 tracks worth for rail shed.

https://www.roxhill.co.uk/portfolio/howbury-park-dartford/masterplan/

Currently still some where in appeals process. Green belt vs jobs etc.

At Slade you need to send/receive trains in both directions unlike OOC
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
There is planning permission in progress for a large logistics park with rail access "Howbury Park" on the fields so there insn't a huge amount of extra width for more rail stuff just 5-6 tracks worth for rail shed.

https://www.roxhill.co.uk/portfolio/howbury-park-dartford/masterplan/

Currently still some where in appeals process. Green belt vs jobs etc.

At Slade you need to send/receive trains in both directions unlike OOC

ah that logistics park is a bit awkward! Bet the planners smile a bit at the idea of finding paths for freight to get out of there!
Presumably getting trains into a single ended shed from both directions might still be easier than sending them all the way to Hoo Junction?
 

ScotGG

Established Member
Joined
3 Apr 2013
Messages
1,585
Plumstead sidings could take 6 tracks of 12 carriage trains north of the existing sidings. Crossrail are vacating the site and no future plans for it. Have a look on google maps at the extensive triangle of brownfield land currently a temporary Crossrail worksite. The permanent crossrail depot is to the east.

Also why not push for expansion in the mid term of Slade Green onto adjacent green belt? That obviously isn't easy but there is precedent. When a freight terminal was approved on appeal there on green belt land NR could have pushed for expansion. That was 5-10 years ago now so missed that window.
 
Last edited:

millemille

Member
Joined
28 Jul 2011
Messages
407
Location
Derbyshire
ah that logistics park is a bit awkward! Bet the planners smile a bit at the idea of finding paths for freight to get out of there!
Presumably getting trains into a single ended shed from both directions might still be easier than sending them all the way to Hoo Junction?

I'm not quite sure where "all the way to Hoo Junction" is coming from?

Everything for the Medway towns runs past there as a matter of course and it's closer to London than Gillingham depot.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,256
ah that logistics park is a bit awkward! Bet the planners smile a bit at the idea of finding paths for freight to get out of there!
Presumably getting trains into a single ended shed from both directions might still be easier than sending them all the way to Hoo Junction?
a) The Dartford station pinch point need addressing anyway.
b) A good number of the trains go out to the Medway towns any way
c) Hoo is only 10 miles away
d) Slade wouldn't close even if you built something at Hoo, it would provide the opportunity for reconfiguration.

Buying the refuse/skip yard to the south and extending that way would address most southern shed issues.
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
I'm not quite sure where "all the way to Hoo Junction" is coming from?

Everything for the Medway towns runs past there as a matter of course and it's closer to London than Gillingham depot.

Southeastern Metro doesn’t go down there does it?
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
a) The Dartford station pinch point need addressing anyway.
b) A good number of the trains go out to the Medway towns any way
c) Hoo is only 10 miles away
d) Slade wouldn't close even if you built something at Hoo, it would provide the opportunity for reconfiguration.

Buying the refuse/skip yard to the south and extending that way would address most southern shed issues.

The logistics park plan has a Rail link that curves round immediately to the south of the southern shed
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,256
The logistics park plan has a Rail link that curves round immediately to the south of the southern shed
The rail link was just to get planning permission, no actually things it would ever get used...
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,256
They would still have to build it though
I'm sure the oweners wouldn't mind too much if it was removed fairly soon afterwards for a better use after they have "ticked the box"
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,999
Location
London
T
At Slade you need to send/receive trains in both directions unlike OOC

You do currently yes, but operationally you could set it up to only send/receive from one direction (i.e to Dartford)
Southeastern Metro doesn’t go down there does it?

True, but there's a lot of Gravesend starters these days.

I reckon if they were truly looking for something new, somewhere like Swanley might be a good shout - on Chatham mainline and can get to Charing X / Cannon St via the loops at Chislehurst Junction. There's a bit of space east of the town. So it's feasible in theory, in practice though you need planning permission, locals on side etc.
 

Islineclear3_1

Established Member
Joined
24 Apr 2014
Messages
6,589
Location
PTSO or platform depending on the weather
Having been through Canterbury East today there appears to be some old siding land beyond the Dover end of the platforms; perhaps a couple of sidings there could store the late weekday CBE terminators that currently go to the Faversham sidings overnight, freeing those up for something else (or an alternative stock arrangement)? :idea:

There used to be an engineer's siding on the Up side south of the station but it is only "one" siding and probably not much use. There used to be a couple of sidings at Sevenoaks from memory but again, not much space.

My money would be to redevelop Chart Leacon. At least the land is still there

What stables in the Jubilee sidings at Tonbridge during the day?
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
Let the Slade Green logistics place break the green belt deadlock then hope they don’t fancy their financial viability anymore (they might be quite happy for the railway to buy half the site off them and release them from having to provide the rail sidings.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,999
Location
London
There used to be an engineer's siding on the Up side south of the station but it is only "one" siding and probably not much use. There used to be a couple of sidings at Sevenoaks from memory but again, not much space.

My money would be to redevelop Chart Leacon. At least the land is still there

What stables in the Jubilee sidings at Tonbridge during the day?

Sevenoaks turnback is used by GTR now and they berth a few units there, but there's only 2-3 sidings I think.
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,470
Location
Taunton or Kent
Southeastern Metro doesn’t go down there does it?

True, but there's a lot of Gravesend starters these days.
There are some peak Strood starters and terminators in the respective peaks that currently come from/go to Slade Green or Plumstead as ECS, if the staff logistics can be altered the rolling stock would have a much easier move from Hoo Jct to manage those peak services if converted.

What stables in the Jubilee sidings at Tonbridge during the day?
Those sidings are favourites for Tunbridge Wells' services and some other long distance stablings, so 465/9 sets and Electrostars are commonly stored there.
 

hkstudent

Established Member
Joined
11 Nov 2018
Messages
1,430
Location
SE London
Let the Slade Green logistics place break the green belt deadlock then hope they don’t fancy their financial viability anymore (they might be quite happy for the railway to buy half the site off them and release them from having to provide the rail sidings.
Metropolitan Green Belt issue is too difficult to break and I don't think SG Depot expansion does have the justfication to de-designate Green Belt designation.
 