61653 HTAFC
Veteran Member
A quick look at the track layout at Huddersfield will show that doing so would be anything but simple.The simple answer to all this is to join together the existing Sheffield-Huddersfield service with the Huddersfield-Bradford service.
Through trains connecting Halifax and Sheffield at no extra operating cost, no additional paths required in total, and no millions spent on curves at Wortley and West Horbury.
I there's any money available to be spent on curves perhaps it could be spent on the existing Horbury Junction. Last time I looked Leeds-Sheffield via Barnsley trains were crawling through at something like 20mph
Whilst those moves are technically possible with the current layout, it requires platform 4 to be kept clear which there isn't capacity for. The single-track sections South of Huddersfield are also a constraint which would mean even a slight delay at Halifax would junk the timetable for anything passing Huddersfield.
Linking the Brighouse and Penistone services across Huddersfield seems to be the new "Cross-Bradford Link" suggestion, perhaps because of nostalgia for a link that used to exist- though even then it was for operational convenience rather than massive demand for Halifax people to get to Brockholes.