No, 6 intermediate coaches plus the DVT.

The fact that you can reform the coaching stock does not make it appropriate for Chiltern (or indeed anywhere else).
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,752
Location
"Marston Vale mafia"
Thinking on a better use for Mk5s might be North Wales, allowing the Mk4 sets to be binned off. That has long been a haven for loco-haulage of various types.

The fact you can reform it means the length not being correct for a given purpose is not relevant, as you just reform it so it is. That's a benefit of LHCS over units, though some units can be reformed (15x easily enough as each coach basically is a single ended MU in its own right, plus 22x with more work) and some have been in the past.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,389
Thinking on a better use for Mk5s might be North Wales, allowing the Mk4 sets to be binned off. That has long been a haven for loco-haulage of various types.

Yes, but of course each time loco-haulage has been used it is because there aren't enough units.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,752
Location
"Marston Vale mafia"
Yes, but of course each time loco-haulage has been used it is because there aren't enough units.

Not in the future case in Wales, there has been a deliberate choice to use 67+Mk4 sets because of the InterCity ambiance. As new units are on order, they could just have ordered a few more if they wanted units.
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,279
Not in the future case in Wales, there has been a deliberate choice to use 67+Mk4 sets because of the InterCity ambiance. As new units are on order, they could just have ordered a few more if they wanted units.

That's a choice made in the light of the current level of financial support provided by the Welsh government.

A future regime could decide it doesn't want to pay for things like a restaurant car service, which would probably put paid to loco-hauled operation as well. These services may be popular with Assembly Members from North Wales but one would have to question the wider benefit to the rest of the Welsh population.
 

mpthomson

Established Member
Joined
18 Feb 2016
Messages
1,384
GWR and ScotRail seem perfectly relaxed about operation of HSTs with their existing gear settings and resulting acceleration for some years to come in places where there isn't an inch of 125mph track.

The HSTs that Scotrail and GWR have are considerably shorter, and therefore lighter and faster accelerating than they were before so they can keep to timings.
Electrification isn’t going to happen under any flavour govt until Network Rail can show that it is capable of competent project management and delivery of projects on time and budget. Grayling was right to call pause when he did, as DfT were just pouring money in for sub-optimal pereformance. Network Rail still haven’t shown that they can.
 

cactustwirly

Established Member
Joined
10 Apr 2013
Messages
8,424
Location
UK
In my opinion it would make more sense to get an upgraded desiro, maybe a bimode version of the desiro verve? Siemens have built a diesel desiro so they can probably build a bimode desiro and the desiro verve has end doors and is more intercity. Plus it will be easier on maintenance as they already have desiros.

Looking at TPE's financial performance, picking 3 smaller fleets may have been a mistake...

Also do the 802s have the range to do the 68/Mk5 routes? 802s have upgraded fuel tanks but are they big enough?

Well if an 802 can do Newbury - Penzance on diesel mode, I'm sure it has plenty of fuel to do TPE routes
 

tpjm

Member
Joined
25 Jan 2019
Messages
487
Location
The North
Goodness...

Can we get these 44 sets in traffic before we start repurposing them? I’m almost offended by this thread! :D
 

Bevan Price

Established Member
Joined
22 Apr 2010
Messages
8,344
Under normal circumstances, the new TPE stock can be expected to last until at least 2050-2055.
By that time, most Voyagers & Pendolinos will probably have gone to the great razor blade factory; a few may have been retained for charter train operations. So - future use of the TP stock is unlikely to be a problem - it will mostly follow the Voyagers, Pendos, into history (not that I expect to be around quite long enough to see that.) Some of the loco hauled TP stock may be a candidate to finally replace Mark 2/3/4 stock in charter fleets.
 
Status