Had my first trip over the Oxford and Worcester line yesterday since the signalling and track movements have been put into place between Moreton in Marsh and Evesham. My first journey was driving an hst to Great Malvern and back, while the second journey was on a two car turbo (165) 2E95 stopping service from Oxford to Worcester F/St. For me the most impressive location was Chipping Campden tunnel where double track has been reinstated although the down line is not connected either end of the tunnel,but is in situ for when that eventually takes place. Still quite a lot of water leaking through the tunnel roof.The track has been slewed over at locations to assist with the redoubling and some signals have been moved to the right hand side which of course is a little strange after so many years in the same place. In all it would appear things are going to plan for the next phase. Did notice a spread in Railnews which documents some of the things concerning the Cotswold Line redoubling. Its strange to have worked over it as a double line,to single line and now returning to a partial double line.