Enhanced Permissible Speed (EPS)

TheEnginneer

Member
Joined
18 Jun 2026
Messages
5
Location
Manchester
Can anyone on here remember why the EPS dips to 115 through Norton Bridge (Fast Lines)? I've got a feeling it was to do with the old junction layout?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

cambsy

On Moderation
Joined
6 Oct 2011
Messages
1,107
I know Norton Bridge used to be 90 mph, with 110mph either side, in loco hauled days, which was think due to layout and curvature. I dont know about Hard Over Tilt Failure at Norton Bridge, but there are several places where due to clearances etc there is no EPS tilt speeds, namely Watford Jct, Crewe, Warrington-Wigan and north of Preston quite a few sections over the fells and borders.
 

QueensCurve

Established Member
Joined
22 Dec 2014
Messages
2,195
It needed land take to get 125mph apparently.
Given the restricted profile of the trains, is HOTF a problem? Also through Norton bridge there is scope for realining the tracks given the reduction from 4 to three since the Down Slow has been rerouted perhaps?
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,642
Given the restricted profile of the trains, is HOTF a problem? Also through Norton bridge there is scope for realining the tracks given the reduction from 4 to three since the Down Slow has been rerouted perhaps?
Not on the up fast there isn't.
 

Tilting007

Member
Joined
21 Oct 2024
Messages
258
Location
Rugby
Norton Bridge is being assessed for 125mph EPS (115MU) which modelling of forces in the S&C being undertaken.
 