Can anyone on here remember why the EPS dips to 115 through Norton Bridge (Fast Lines)? I've got a feeling it was to do with the old junction layout?
Curvature.Can anyone on here remember why the EPS dips to 115 through Norton Bridge (Fast Lines)? I've got a feeling it was to do with the old junction layout?
HOTF?A report I've seen is blaming the (at the time) potential HOTF.
Thank you.Hard Over Tilt Failure
Thank you. BTW -welcome to the forum.Hard Over Tilt Failure
It needed land take to get 125mph apparently.A report I've seen is blaming the (at the time) potential HOTF.
Given the restricted profile of the trains, is HOTF a problem? Also through Norton bridge there is scope for realining the tracks given the reduction from 4 to three since the Down Slow has been rerouted perhaps?It needed land take to get 125mph apparently.
Not on the up fast there isn't.Given the restricted profile of the trains, is HOTF a problem? Also through Norton bridge there is scope for realining the tracks given the reduction from 4 to three since the Down Slow has been rerouted perhaps?
There will be various ex staff of Virgin saying "I told you so" if they increase it.Norton Bridge is being assessed for 125mph EPS (115MU) which modelling of forces in the S&C being undertaken.
There will be various ex staff of Virgin saying "I told you so" if they increase it.
True!
Same if Kilsby and Watford are raised.