Does anyone know what the engineering works are between Manchester and Bolton on Saturdays? There's no trains running on Saturdays between Manchester and Bolton until Saturday 17th February 2024.
Engineering work will affect areas in the Northwest of our network between January and March 2024


Given that the Bolton route is being affected by closures does this mean that work is also being carried out at Windsor Bridge North Jn? And will the sidings on the Atherton line just to the west of the junction be rejuvenated to enable trains to be reversed at Salford Crescent from the Manchester direction?Electrification work, drainage and track renewal at Hindley, under track crossings (cables etc), track renewal at Swinton, track renewal at Pendleton.
Given that the Bolton route is being affected by closures does this mean that work is also being carried out at Windsor Bridge North Jn? And will the sidings on the Atherton line just to the west of the junction be rejuvenated to enable trains to be reversed at Salford Crescent from the Manchester direction?
That is an enhancement, not a renewal. As some of the work is at Pendleton itself, you couldn't use them anyway. As @Geeves has noted, new turn back sidings will be provided at Hope St prior to Salford Crescent for TRU.Given that the Bolton route is being affected by closures does this mean that work is also being carried out at Windsor Bridge North Jn? And will the sidings on the Atherton line just to the west of the junction be rejuvenated to enable trains to be reversed at Salford Crescent from the Manchester direction?
Passengers are being urged to check before they travel while £2.7m of essential drainage work to reduce flooding and improve the reliability of the railway between Bolton and Manchester takes place over the next five weekends.
Every weekend from 6 January to 4 February, bus replacement services will be in place at all railway stations between Bolton, Salford Crescent, Salford Central, Manchester Piccadilly and Manchester Victoria while Network Rail completes vital drainage upgrades in response to recent storms.
Tom Carrington, project manager at Network Rail, said: “We are very sorry to weekend passengers travelling between Bolton and Manchester for the inconvenience to their journeys while we put in a better drainage system to future proof the railway from heavy rainfall experienced during recent storm events.
“While journeys can still take place between Bolton and Manchester via bus replacement services, and from Preston and Blackpool with train services diverting through Wigan, it’s important passengers know their travel options first by checking before they travel at nationalrail.co.uk.”
Craig Harrop, regional director for Northern, said: “I’d like to thank our customers for their co-operation and patience while these important works take place. It is important to allow more time for your journey during this period and if in doubt, ‘check before you travel’ on the Northern website.”
Every weekend from Saturday 6 January until Sunday 4 February, the railway between Bolton and Manchester will be closed while 1404 metres of new drainage pipes are laid and six foot trenches are dug to better manage water levels to keep passengers and freight on the move.
Not if its embankment related.Is there likely to be any end to the 75mph TSR on the Up line at the embankment south of Kearsley?
Murphy's had a site set up around autumn 2022, regraded the embankment and finished work last spring (2023) but still the TSR remains. Bizarre.Not if its embankment related.
Is there likely to be any end to the 75mph TSR on the Up line at the embankment south of Kearsley?
So, where is "Springs Tunnel"?![]()
Are they possibly referring to Springs Branch?Springs tunnel is near Baildon on the Yorkshire triangle, so I think someone has got their wires crossed here.
edit - it's between Baildon and Guiseley, closer to the latter.
Thanks, hadn't noticed. Not a huge help that the Blackpool North to Airport service is pathed immediately behind the Rochdale.Already lifted a couple of months ago.
Oooo so *that’s* why the Blackpool - Airport routinely has to wait outside Salford Crescent.Thanks, hadn't noticed. Not a huge help that the Blackpool North to Airport service is pathed immediately behind the Rochdale.
Resource more than likely, also you need operators to agree to it.Why this work could not be done in December over the Christmas period with a December closure