Apologies if there's already a thread on this (if there is I can't find it), but as I recall the Class 91s first entered service on King's Cross-Leeds services in March 1989, initially with HST sets but with a 91 in place of one power car while the other power car effectively became a surrogate Driving Van Trailer, then the Mark 4 sets were introduced on the route with the 1989/90 winter timetable in October of that year.

As far as electric services to Newcastle and Edinburgh were concerned, IIRC they were planned to be introduced with the May 1991 timetable but there were various complications that led to a phased introduction of the 91s on the Newcastle and Edinburgh services between May and July of that year so BR had to issue a temporary timetable to cover that period.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Sun Chariot

Established Member
Joined
16 Mar 2009
Messages
6,753
Location
2 miles and 50 years away from the Longmoor Milita
I spent a few Saturdays at Leeds Station in the first half of 1990. As you say, services between King's Cross and Leeds were in the hands of 91s with:
- Mk3 rake + HST power car for a) auxiliary power to coaches and b) as supplementary traction. The power cars ran, initially, at idle for aux only: but I recall that gave rise to problems.
- Mk4 rake including DVT.

As an aside, the first 91s I saw were on test, August 1988:
- 91004 at Doncaster, with the rake of Mk3 sleeping cars.
- 91006 at Nuneaton, with front bogie on a wheel skate. I don't know why it was there.
 
Last edited:

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,337
Location
Glasgow
The power cars ran merely at idle for aux only: but I recall that gave rose to problems.
- Mk4 rake including DVT.
Exhaust fires being just one of them. One of the worst damaged several hundreds yards of brand-new overhead wire - very shortly after that, the control system was modified so the power cars supplied traction power in the normal way.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,337
Location
Glasgow
That's the one! Thanks for reminding me.
No worries, that particular issue is fairly well documented and mentioned in relation to the short-lived super power 91/HST hybrid sets - the other, lesser issues aren't mentioned as frequently likely because they were less significant.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,337
Location
Glasgow
Without wanting to take the thread too far off course someone who’s quite good at providing information on this sort of stuff provided quite a bit of information on the subject a few years ago. ;)
Lol, i even tried to find that and couldn't - so many thanks @Cowley

== Doublepost prevention - post automatically merged: ==

The surrogate DVTs were given buffers and kept them until final withdrawal.
Certain TGS also gained buffers, drawhooks and drophead buckeyes.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,435
Location
The Fens
then the Mark 4 sets were introduced on the route with the 1989/90 winter timetable in October of that year.
For most of the winter 1989/90 timetable the Leeds trains remained class 91+Mark IIIs+HST, though there was a token Mark IV working from November 1989. The switch from class 91+Mark IIIs+HST to class 91+Mark IVs+DVT was in March 1990.

led to a phased introduction of the 91s on the Newcastle and Edinburgh services between May and July of that year so BR had to issue a temporary timetable to cover that period.
The summer 1991 timetable has a start date of 8 July. The first Newcastle/Edinburgh workings were on 10 June with 2 new diagrams being introduced each Monday 10 June to 1 July.
 
Last edited:

55002

Established Member
Joined
16 Aug 2019
Messages
5,414
Location
Ldn
The inaugural run of Mark 4s was on Weds 20th Sept 1989 when 91001 did a press run from KGX to Leeds and back. 1T06 1125 from KGX and 1T07 1540 return from Leeds

First passenger service I saw was 91001 on 1D32 0650 KGX-LDS on 23rd March 1989, 1A12 1001 return, 1D39 1320 KGX-LDS. That’s not to say that was the first working. 91001 had been doing a test run the day before however.

the first full day of 91 plus MK 3 was Monday 15th May 1989. I saw 91001/004/006/007/008 out that day.

The first ever Class 91 north of Grantham was on 16th June 1988 when 91001 worked 1G52 1155 Peterborough to Doncaster and 1G53 1345 return to Bounds Green test trains.
 
Last edited:

43096

On Moderation
Joined
23 Nov 2015
Messages
18,889
The surrogate DVTs were given buffers and kept them until final withdrawal.
Final withdrawal? None have been withdrawn - two leased to Network Rail for the NMT and the other six are the active RailAdventure fleet.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,889
Certain TGS also gained buffers, drawhooks and drophead buckeyes.
I've never understood the logic of why the TGS vehicles needed those modifications - they were always coupled to a Class 91 which had buckeyes. The only mod they would need (and got) was the fitting of RCH jumper cables to interface with the TDM kit on the Class 91. There was also an internal mod on the TGS to interface the RCH jumper into the standard HST 36-way control jumper.
 

Sun Chariot

Established Member
Joined
16 Mar 2009
Messages
6,753
Location
2 miles and 50 years away from the Longmoor Milita
Did 91s ever operate sleepers in revenue service or was it only ever done during testing?
The 91 operating proposition was pitched as "blunt end for slower services (such as the Mk2f 64xx high density stock) and sleeper services" but the ECML had lost its sleeping car workings by the time 91s entered squadron service.
 
Last edited:

55002

Established Member
Joined
16 Aug 2019
Messages
5,414
Location
Ldn
The 91 operating proposition was pitched as "blunt end for slower services (such as the Mk2f 64xx high density stock) and sleepers" but that never happened. The ECML had lost its sleeping car workings by the time 91s entered squadron service.
Yep think the sleepers stopped in May 1988 timetable
 

GatwickDepress

Established Member
Joined
14 Jan 2013
Messages
2,588
Location
Leeds
The 91 operating proposition was pitched as "blunt end for slower services (such as the Mk2f 64xx high density stock) and sleeper services" but the ECML had lost its sleeping car workings by the time 91s entered squadron service.
Fascinating, thank you for that. I had always wondered if the blunt end of the 91s were purely for shunting purposes or if they had other ideas.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,435
Location
The Fens
Some of the Cambridge services perhaps?
From 1978 to 1988 there were no through Kings Cross-Cambridge services, only an EMU/DMU connection at Royston. Through trains resumed in 1988 with class 317s.

In 1988/89 there was a 0700 Peterborough-Kings Cross and 1736 Kings Cross-Peterborough worked by 89001 when it wasn't broken.
 

Sun Chariot

Established Member
Joined
16 Mar 2009
Messages
6,753
Location
2 miles and 50 years away from the Longmoor Milita
What types of services on the ECML still used mark 2s at the end of the 80's? Or was intended for later orders of the 91s that we never got?
:)
 

Transilien

Member
Joined
10 Mar 2024
Messages
763
Location
Ayrshire
:)
Thanks, I’m guessing once the mark 4s had entered service they would have went away.
 

Strathclyder

Established Member
Joined
12 Jun 2013
Messages
3,848
Location
Clydebank
In 1988/89 there was a 0700 Peterborough-Kings Cross and 1736 Kings Cross-Peterborough worked by 89001 when it wasn't broken.
Both captured by Martin Loader on 16th August 1988, acccompanied by 43013 on this particular day:

07:00

17:36

The rest of his photos from Abbots Ripton that morning are also worth a look imho:




 

Helvellyn

Established Member
Joined
28 Aug 2009
Messages
2,592
The Class 91 blunt end was to allow the locos to be used on ECML Sleeper, Parcels and freight services. When the Class was designed there were fewer early/late services so this was seen as a way of getting more use from the locos as seen on the WCML where Class 87s were used on Freightliner and Steel workings overnight, plus Parcels and Sleeper traffic. As sectorisation developed there was less desire to share locos this way (why risk an Anglo-Scottish service from Glasgow being delayed due to a late arrival at Mossend of the booked Class 87 on a Freightliner for example).

I think ECML Sleepers went as part of the gradual contraction of the market and a May '88 end date probably helped with overnight possessions for electrification work as it moved Northwards. It was suggested some services would move back to the ECML but the early 1990s recession probably put paid to that when the Anglo-Scots Sleepers became just one service per destination (You initially had two Aberdeens, etc.).

The Mark 2s used were short-lived peak commuter sets to try keep Grantham/Peterborough passengers off HSTs and then the Mark 4s. 30 Mark 2F TSOs with high-density seating (68xx series, APT style IC80 seats) were convered from SOs (64xx series, declassified Mark 2F FOs). They were split between Derby and Bounds Green to allow two MML loco-hauled peak sets and two ECML ones. Again, the recession of the early 1990s killed these off and the 68xx TSOs went to Anglia to complete the replacement of the remaining Mark 2D TSOs there.
 

ecmlthrash15

Member
Joined
15 Jul 2022
Messages
45
Location
United kingdom
I still recall travelling in july 1991 on the 1145 peterborough to newcastle. Train was due to arrive at 1345. We left Peterborough 10 minutes late, and still arrived in Newcastle on time.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,337
Location
Glasgow
I still recall travelling in july 1991 on the 1145 peterborough to newcastle. Train was due to arrive at 1345. We left Peterborough 10 minutes late, and still arrived in Newcastle on time.
Even today that's still possible on some services with a clear run and cutting station dwells slightly.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,337
Location
Glasgow
Obviously, the 91s could accelerate faster than a hst
At higher speeds, yes, but an HST is actually quicker to about 60mph and the 91 only starts pulling ahead above about 80mph.

The overall difference though is about 2 to 2.5 mins on the 0-125mph time. So straightaway, you do save about 2 mins on each acceleration to maximum linespeed between stops.
 

jfollows

Established Member
Joined
26 Feb 2011
Messages
10,174
Location
Wilmslow
From 1978 to 1988 there were no through Kings Cross-Cambridge services, only an EMU/DMU connection at Royston. Through trains resumed in 1988 with class 317s.

In 1988/89 there was a 0700 Peterborough-Kings Cross and 1736 Kings Cross-Peterborough worked by 89001 when it wasn't broken.
Even in 1988 I don’t think the power supply allowed AC electric locos to be used Hitchin-Cambridge, it took a few more years until these were allowed.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,435
Location
The Fens
Even in 1988 I don’t think the power supply allowed AC electric locos to be used Hitchin-Cambridge, it took a few more years until these were allowed.
Yes the power supply was restricted, though there were a few instances of diverted class 86s in 1988/89.

The class 91+MarkIII+HST trains were diverted via Cambridge on a few weekends in 1989 but with diesel locos attached.
 