East Kilbride/Barrhead electrification updates

Status
Not open for further replies.

TrainViation

Member
Joined
25 Jun 2025
Messages
292
Location
Glenrothes
The photographs of the 'dignitaries' at East Kilbride look very odd, almost as if they've just been photoshopped in. Obviously they were there so no reason for them to have been but very odd.
They definitely look edited, over-sharpened at least. Not sure why they would need that done though.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Joined
14 Mar 2021
Messages
211
Location
Glasgow
The photographs of the 'dignitaries' at East Kilbride look very odd, almost as if they've just been photoshopped in. Obviously they were there so no reason for them to have been but very odd.

There was a report on the STV News at 6 (probably the Glasgow edition) - see here.
Diesel-powered trains are set to operate 25% of services on a newly electrified ScotRail line between Glasgow Central and East Kilbride.

The train operator has said that 75% of services on the £144m electrified line will be operated by electric trains, marking a “significant step forward in Scotland’s ongoing rail decarbonisation programme”.

Modern, electric four-carriage class 380 trains will replace the current four-carriage class 156 diesel trains on the East Kilbride route.

Six-carriage class 156 trains will also continue to operate.
 
Last edited by a moderator:

OB23Gone

Member
Joined
22 Aug 2022
Messages
186
Location
Glasgow
The photographs of the 'dignitaries' at East Kilbride look very odd, almost as if they've just been photoshopped in. Obviously they were there so no reason for them to have been but very odd.
Sad to say that they are not of the best quality. The lighting at Thornliebank was very poor and the unit at Shaws West was not quite in focus possibly due to camera shake as I had been standing about for a half hour in the cold. Yes basically Historical shots no more than that. Thanks for your comments though and hopefully come Sunday the sun will be higher and brighter and I am in a more open area.
Thanks again
 
Joined
5 Aug 2015
Messages
898
Location
Norfolk
That is a good question which I have pondered myself!
glad I wasn't the only one! The other strange neutral section in Glasgow is on Larkhall line just before Haughhead Junction. Furthermore, it was mentioned as being added to the line in January this year. I've heard there's meant to be a new feeder station coming in at Newton but can't see how Haughhead Junction OHNS fits with that. Haughhead to Motherwell connects to Motherwell to Newton which is joined to Newton to Haughton.
 

MadMac

Established Member
Joined
13 Jun 2008
Messages
1,494
Location
Moorpark, CA
glad I wasn't the only one! The other strange neutral section in Glasgow is on Larkhall line just before Haughhead Junction. Furthermore, it was mentioned as being added to the line in January this year. I've heard there's meant to be a new feeder station coming in at Newton but can't see how Haughhead Junction OHNS fits with that. Haughhead to Motherwell connects to Motherwell to Newton which is joined to Newton to Haughton.
Possibly to allow the Larkhall line to be isolated independently?
 
Joined
5 Aug 2015
Messages
898
Location
Norfolk
Possibly to allow the Larkhall line to be isolated independently?
1765302193804.png
It can't be doing that either as, although the diagram is a bit unclear, the mileages seem to suggest the neutral section is on the glasgow side of the junction on HMN line only and not at all on the LRK line

== Doublepost prevention - post automatically merged: ==

considering it was only Jan this year, it's possible we're in the middle of something and maybe they'd add another neutral section perhaps at Newton on the Hamilton Line which would make it make sense.
potentially the case for the Cathcart line although it's been two years at least
 
Last edited:

Carntyne

Member
Joined
8 Jul 2015
Messages
1,024
They should be trying to move to DCO/DOO as quickly as they can, ahead of the replacement suburban fleets coming in.
 

GLC

Member
Joined
21 Nov 2018
Messages
395
AIUI Strathclyde manning agreement permits electric services within Strathclyde to run as DOO, but when Scotrail tried to introduce DOO on services to Barrhead on electric services were introduced, staff threatened to strike and the plan was abandoned
 

380101

Member
Joined
18 Feb 2015
Messages
1,141
AIUI Strathclyde manning agreement permits electric services within Strathclyde to run as DOO, but when Scotrail tried to introduce DOO on services to Barrhead on electric services were introduced, staff threatened to strike and the plan was abandoned

The Strathclyde Manning Agreement was updated in December 2024. A 2nd member of staff MUST be on the train now or the driver can refuse to take it. This resulted in ScotRail recruiting over 150 additional Ticket Examiners to ensure all Strathclyde electrics have a 2nd person all the time.

This was a welcome change and ensures anyone with reduced mobility can turn up and go at any station.
 

matt

Forum Staff
Staff Member
Global Moderator
Joined
30 Jun 2005
Messages
8,849
Location
Rugby
As the electrification is now complete this thread has run its course.
 