50002Superb
Established Member
Hi All,
I’ve been trying to understand how the coil workings from Margam actually work in practice.
It seems like there is one scheduled working a day each way but can someone clarify:
Many thanks
50002Superb
I’ve been trying to understand how the coil workings from Margam actually work in practice.
It seems like there is one scheduled working a day each way but can someone clarify:
- When the loco arrives at Dee Marsh I assume it is then detached and works the next scheduled working back to Margam?
- Once the loco is detached from the coil wagons on the incoming working, are the wagons all then immediately shunted into Shotton Steel “as one” or broken up into smaller workings to be unloaded?
- On point 2 above I assume that time is of the essence to get the wagons unloaded so that they are shunted back to Dee Marsh sidings, to then be attached to the loco from the next incoming working. How long do they have to get those wagons in and out of Shotton Steel?
- When the Wagons return back to Margam are they effectively then empty?
- How long before the return working to Margam do the wagons need to be shunted back into position? Is it sometimes the case that the incoming loco will arrive at Dee Marsh Sidings and the wagons for the return journey are not yet ready to go?
- How consistently do the diagrams from Margam to Dee Marsh Sidings actually work?
Many thanks
50002Superb