truckman060473
Member
on some workings this has occured as a result of them storing class 60's but can they be used on increased weight now? for example the Westerleigh to Robeston tanks normally in the hands of a 60 is now seen with either a single 66 or sometimes dual 66's. the 60's worked anything up to about 25 bogie tanks. is there a restriction to the length of freight trains that could prevent a dual 66 from working longer trains than 25 tanks here seeing that double heading may be used?