• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Current and recent station rebuilds in the Netherlands

Status
Not open for further replies.

NCT

Established Member
Joined
18 Apr 2025
Messages
2,334
Location
London
They can't run through anyway as the local lines aren't electrified. For rolling stock transfers (for example when Meppel - Leeuwarden would be closed) it is possible to have NS rolling stock being pulled by a diesel locomotive use the local line to get to Leeuwarden as there is a non-electrified connection track between the workshop at Onnen and both halves of Groningen station.

The other thing the Netherlands is very good at is asking passengers to change between electric and diesel trains for maximising straight EMU running under wires.

The British temptation would be to run bi-modes or even diesel under wires, like London - Leeds services extended to Harrogate.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Status
Not open for further replies.

Top