Bletchleyite
Veteran Member
I seem to recall that LM do actually want to do something very similar to what you suggest. I don't recall what the progress on it has been.
It also doesnt block a platform at Crewe for nearly 40 minutes as it doesnt return to London but runs ECS to the C.S.
What happens at 20:30 isnt an indication of what could happen at 16:00.
Personally, as far as the Crewe services are concerned, Id like to see them run direct from Crewe Stafford. That would speed up the journey significantly more than replacing the units with 125 mph stock.
Divert the xx:49 departure from Crewe Birmingham via Stoke, calling at all stations, and retime the Euston service from Crewe so it picks up its existing path from Stafford.
That way you would still have 2 tph direct from Crewe Birmingham, the Crewe Euston is speeded up, the Crewe Stoke line would have better spacing between its services (a 2 tph service where one follows immediately behind the other is just bizarre), and any passengers between Alsager & Stone would still have a convenient connection onto the Euston service at Stafford.
It also doesnt block a platform at Crewe for nearly 40 minutes as it doesnt return to London but runs ECS to the C.S.
What happens at 20:30 isnt an indication of what could happen at 16:00.
Personally, as far as the Crewe services are concerned, Id like to see them run direct from Crewe Stafford. That would speed up the journey significantly more than replacing the units with 125 mph stock.
Divert the xx:49 departure from Crewe Birmingham via Stoke, calling at all stations, and retime the Euston service from Crewe so it picks up its existing path from Stafford.
That way you would still have 2 tph direct from Crewe Birmingham, the Crewe Euston is speeded up, the Crewe Stoke line would have better spacing between its services (a 2 tph service where one follows immediately behind the other is just bizarre), and any passengers between Alsager & Stone would still have a convenient connection onto the Euston service at Stafford.
That makes sense, wonder why LM don't do it though or when they will be able to do it?
That makes sense, wonder why LM don't do it though or when they will be able to do it?
It doesn't make sense for Liverpool-Birmingham passengers, who would see their journey options cut as a result, down to effectively an hourly service because of the time penalty of going via Stoke.
There isn't a technical reason why they couldn't use UDS at Alsager and Stone, though I think there is an issue with an 8-car blocking a level crossing. I also don't think a blocked platform at Crewe would be a huge issue, they could fit a 3-car Northern and an 8-car 350 quite comfortably in platform 1 (assuming the signalling allows it).
It also doesnt block a platform at Crewe for nearly 40 minutes as it doesnt return to London but runs ECS to the C.S.
What happens at 20:30 isnt an indication of what could happen at 16:00.
Personally, as far as the Crewe services are concerned, Id like to see them run direct from Crewe Stafford. That would speed up the journey significantly more than replacing the units with 125 mph stock.
Divert the xx:49 departure from Crewe Birmingham via Stoke, calling at all stations, and retime the Euston service from Crewe so it picks up its existing path from Stafford.
That way you would still have 2 tph direct from Crewe Birmingham, the Crewe Euston is speeded up, the Crewe Stoke line would have better spacing between its services (a 2 tph service where one follows immediately behind the other is just bizarre), and any passengers between Alsager & Stone would still have a convenient connection onto the Euston service at Stafford.
It doesn't make sense for Liverpool-Birmingham passengers, who would see their journey options cut as a result, down to effectively an hourly service because of the time penalty of going via Stoke.
See this post here:
Besides Northern at one point were fabled sometime in future to be running a service via Stoke which would have speeded up the LM Crewe service by running Stafford to Crewe directly.
There are apparently now a few 8-car Crewe services, they don't use the bay, and I assume use UDS at the short platforms.
Mentioned it on a HS2 thread I think but I am still putting money on Trent Valleys going 8 car, direct to Crewe, Walsall - Wolves becomes Walsall - Crewe via Stoke. Liverpool - Birminghams stay as is.
I think they UDS at Rugeley at least. UDS - possibly the dumbest idea for selective doors yet....
How much time is saved by the LM Crewe services going direct between Stafford and Crewe vs going via Stoke?
Would the time saving result in more efficient use of the LM Class 350/1s and 350/3s by diagramming them better ie getting more mileage out of them?
I do agree that the Trent Valley will go to 8 car operation although with one or two in the peaks being 12 cars using SDO.
It isn't about the time saving, it is about the capacity. Would be very surprised if they ever tried 12 cars as it isn't that bad yet!. You would have to lose Atherstone for a start as the platforms there can't do 8 as it is.
alternatives could be a second train per hour, maybe splitting off 4 at Northampton from a Brum train or if GNWR actually get going, that would provide extra capacity for the principle TV stations - LTV, Tamworth and Nuneaton.
It would be a very minor inconvenience to Liverpool passengers.
But for whose benefit?
The London Midland service is not designed for Crewe to London passengers, it only goes that far to provide a local service at Alsager and Stone. Passengers travelling from Crewe to London have 3tph express to London on Virgin.
On the other hand, the London Midland service from Liverpool is designed for long-distance use.
It isn't about the time saving, it is about the capacity. Would be very surprised if they ever tried 12 cars as it isn't that bad yet!. You would have to lose Atherstone for a start as the platforms there can't do 8 as it is.
If and when the LM Crewe services go direct via Stafford, are there any aspirations to make it half hourly 4 cars or just a hourly 8 car?
for people with a bit of time, they are like the megabus of the train world, takes longer but much cheaper.
Why? It does mean fewer doors are opened than perhaps could be, but it is simple and it does the job.