An interesting feature of the accident is that both trains were intended to run "wrong line" over the reversible tracks over the viaduct and through the tunnel, to maintain driver familiarisation. The route was set for the up train to cross in front of the down train, which shoukld have been held at the crossover point, but the down train was unable to stop at the end of the reversible section.