Copyhold Railway Signalling

Status
Not open for further replies.

minty625

Member
Joined
10 Jan 2024
Messages
11
Location
Manchester
Come across a document that mentions copyhold and how it's a control associated with point end correspondence. Anyone have any information about it or what it means? Thanks
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,488
Location
Northampton
Come across a document that mentions copyhold and how it's a control associated with point end correspondence. Anyone have any information about it or what it means? Thanks
Copyhold Junction is on the Brighton Main Line a short way south of the Ouse Valley (Balcombe) Viaduct, where the loops for Haywards Heath platforms widen out. There is a freight-only branch from Ardingly that joins at a south-facing junction here. I don't know if there are any other Copyhold jns around the network or if Copyhold controls aren't associated with the junction at all.
There was a crash at Copyhold Jn in 1985 but the technical report concludes it was due to leaf fall causing low adhesion. https://jonroma.net/media/rail/accident/uk/mot/MoT_Copyhold1985.pdf

Unfortunately I can't help with the specific controls, I know there are some signallers who cover (or covered) that area active on the forums though so they may be able to help if they stumble across this thread.
 

norbitonflyer

Established Member
Joined
24 Mar 2020
Messages
5,681
Location
SW London
An interesting feature of the accident is that both trains were intended to run "wrong line" over the reversible tracks over the viaduct and through the tunnel, to maintain driver familiarisation. The route was set for the up train to cross in front of the down train, which shoukld have been held at the crossover point, but the down train was unable to stop at the end of the reversible section.
 