coppercapped
Established Member
I'm not sure quite what you mean by 'ECML equipped'. The signalling systems that the Class 345s will use are Communications Based Train Control (CBTC) in the tunnels (in this case Siemens' 'Trainguard' system), the standard Network Rail multi-aspect signalling with TPWS on the Great Western and Great Eastern Main Lines and the European Train Control System (ETCS) in the Heathrow tunnels which is intended to replace the BR-era Automatic Train Protection (ATP) system.Yes. Signalling. I don't think the GWML beyond Reading is ECML equipped.
There is no intention to extend Trainguard over the GW or the GE but there are longer term aspirations to extend ETCS, and the overlaid European traffic management system (ERTMS), over the GW main line as this offers the same train protection as the obsolete ATP which will be replaced.
I'm sure that the trains could run over the lines, but I can't see the train operators taking kindly to the thought of a 90mph train mixing it with 125mph trains on a double track route.Similarly, would there be anything preventing a 345 from running from, say, Norwich to Bristol or Cardiff (once the electrification is complete)?
And I'm not sure I would want to sit sideways for a couple of hours...