I actually currently commute to Cheadle sometimes using the Mid Cheshire line so would be one of the people who'd benefit massively from a new station there, but doing this before any work is done on the surrounding infrastructure to support it is a massive red flag to me. If I remember correctly, the Nav Road to Stockport section was freight only for a while (is anyone able to confirm that?), presumably explaining the single track section. Not rectifying that bottleneck before placing a new station on top of it feels like it's asking for trouble. The Mid Cheshire line sees relatively good reliability compared to the surrounding lines but the single track bottlenecks, both there and at Nav Rd are what seem to cause the most issues.

If Network Rail are serious about doing anything with the Mid Cheshire Line then a new Cheadle station would be down my list of priorities. Doing the Mobberley-Airport connection would be my first port of call, then electrification. I’d convert the old Ashley-Stockport section to Metrolink.
I agree with this, with the slight amendment of turning Mobberly into a bit of a national rail/metrolink interchange. The journey times from the Northwich stations to Manchester are too long IMO already without the new Cheadle stop. Probably off topic I suppose. A new general thread about what should be done around the line is probably in order.
 

Baxenden Bank

Established Member
Joined
23 Oct 2013
Messages
4,759
I can't speak for @Rail Ranger but a link to a report on the consultation process, here: Stockport Metropilitan Borough Council states:

comments:
A desire for the proposals to be more ambitious (16 comments) in terms of passive provision for a second line / platform and encouraging active travel

report response:
The scope of this project is to allow for passenger services to stop on the Mid-Cheshire line at Cheadle under the current service pattern, which is just one train per hour. Work is ongoing outside of this project to look at the future demand and capacity along this line. The project will not prohibit the introduction of a second line and platform in future if they are required.
 

Rail Ranger

Member
Joined
20 Feb 2014
Messages
1,151
Thanks Baxenden. AI says "The platform for the new Cheadle railway station is being designed so that it can be "trimmed back" or adjusted to safeguard the space should a double track ever be reinstated along that section of the line".

== Doublepost prevention - post automatically merged: ==

I actually currently commute to Cheadle sometimes using the Mid Cheshire line so would be one of the people who'd benefit massively from a new station there, but doing this before any work is done on the surrounding infrastructure to support it is a massive red flag to me. If I remember correctly, the Nav Road to Stockport section was freight only for a while (is anyone able to confirm that?), presumably explaining the single track section. Not rectifying that bottleneck before placing a new station on top of it feels like it's asking for trouble. The Mid Cheshire line sees relatively good reliability compared to the surrounding lines but the single track bottlenecks, both there and at Nav Rd are what seem to cause the most issues.


I agree with this, with the slight amendment of turning Mobberly into a bit of a national rail/metrolink interchange. The journey times from the Northwich stations to Manchester are too long IMO already without the new Cheadle stop. Probably off topic I suppose. A new general thread about what should be done around the line is probably in order.
Yes Deansgate Junction to Edgeley Junction, Stockport was freight only until the Mid Cheshire Line service was diverted that way in May 1989. Previously the service ran via Sale to Manchester Oxford Road. Sharston Junction to Cheadle Village Junction (through Cheadle) was singled in the early 1970s so that two new underbridges for the new motorway (then the M63) would only have to accommodate a single line.
 

Baxenden Bank

Established Member
Joined
23 Oct 2013
Messages
4,759
Thanks Baxenden. AI says "The platform for the new Cheadle railway station is being designed so that it can be "trimmed back" or adjusted to safeguard the space should a double track ever be reinstated along that section of the line".
AI says whatever! Does it have reliable sources?

The officer report here into the planning application (granted) states:
The proposed single platform to serve the proposed railway station would be sited on the Northern side of the existing Chester to Manchester railway line, would consist of a modular platform design of lightweight construction and would include covered waiting shelters for passengers.

The drawings accompanying the planning application show a bolted together system under the brand 'Systra', drawing here.

If the links don't work, the planning reference to enter on the Stockport planning portal is: DC_084801
 

davechis

Member
Joined
12 Aug 2016
Messages
7
Thanks for the responses. Wonder how they intend to trim back the platform, not heard of that engineering technique before!
 

Rail Ranger

Member
Joined
20 Feb 2014
Messages
1,151
I've read many times that the station is being built in such a way that the platform can be moved northwards to allow space for double track and a second platform. That would tally with "a modular platform design of lightweight construction" mentioned above.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,450
Location
Somerset
Thanks for the responses. Wonder how they intend to trim back the platform, not heard of that engineering technique before!
Without having seen the site, the “obvious” solution is to build a permanent platform (with all fixtures, fittings and associated services) to serve the currently non-existent second track then “bolt” some pre-fab modular platform in front of it, that is robust enough to be a permanent solution, but which can be removed without having to do anything to the “real” platform other than install new tactiles and paint a new yellow line.
 

The Pelican

Member
Joined
3 Oct 2025
Messages
424
Location
London
East Didsbury looks like it's a couple of miles north of Cheadle, and will probably get a Metrolink extension to Stockport soon.
 

Baxenden Bank

Established Member
Joined
23 Oct 2013
Messages
4,759
There is no way that the platform can be 'trimmed back' to accommodate the second track, should it be re-instated. It sits fairly and squarely on the formation where the second track would go. Drawing 084801-GENERAL_ARRANGEMENT_PLAN-2189036 refers.

To re-instate a second track would require unbolting of this platform, it's movement north off the formation on the north side and the construction of a second, new, platform on the south side to serve the current track. Such relocation would remove 32 of the proposed car parking spaces (just under half).

Some might suggest that the platform should be built on the south side of the current line from the outset, but then it would be on the wrong side for the proposed car park. Alternatively the track could be slewed to the northern side and the platform built there in a final, two-track railway location.
 