D365
Veteran Member
- Joined
- 29 Jun 2012
- Messages
- 13,210
All depends how long they were intended to last when they were designed.
30 years, according to the Electra documentary series that aired when the type was first introduced.
I know this is going to sound silly and I believe it has been suggested before, but if VWC had trains to replace their class 221's, say like the Hitachi AT300 surely then the class 221's could then be moved to XC?
And how is that going to help VWC with their requirement for tilting trains?
In an ideal world XC would also be using AT300 type trains that as well as having overhead electrical capability, also had third rail DC capability as per the class 395.
Once again, why? SpacePhoenix has claimed this to be a good idea, despite being told on a multitude of occasions that the third rail supply is not capable of powering more trains.