• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Braintree Released (GE v1.3)

Status
Not open for further replies.

Coxster

Established Member
Joined
9 Jun 2005
Messages
9,243
Version 1.3 of Great Eastern is now available - The Braintree Branch. This therefore completes the original product as it was planned to be. You require the past versions and upgrades to have been installed in order before using this new upgrade. Four new activities are also included with this upgrade.

v1.0: Base Product
v1.1: Sudbury Branch
v1.2: Upminster Branch
v1.3: Braintree Branch (this upgrade)

http://www.makingtracks-online.co.uk/index.php?option=com_content&task=view&id=388&Itemid=289
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

westcoaster

Established Member
Joined
4 Dec 2006
Messages
4,495
Location
DTOS A or B
is it me or do you not get power leaving braintree, you always have to press z ( reset) to get power.
 

Daniel

Established Member
Joined
5 Oct 2005
Messages
2,565
Location
London
Not downloaded it yet, but that sounds realistic, then - there's normally an isolated section entering a branch ;)
 

westcoaster

Established Member
Joined
4 Dec 2006
Messages
4,495
Location
DTOS A or B
sorry should have explained when i load up an activity to start at braintree, i put the reverser in forward, wait for time release the brake, and start to accelerate, but there is no power and the train starts to roll back towards the stops, the only way you get power is to press z, then you get power back, and all is then well with no further problems.
 
Status
Not open for further replies.

Top