Barry Island Station - Further Deterioration

Status
Not open for further replies.

Envoy

Established Member
Joined
29 Aug 2014
Messages
3,143
I raised the issue of the deterioration of Barry Island station about 4 years ago. I revisited last weekend and sadly the deterioration has continued - although some remedial work is taking place on the canopy - presumably because it was starting to collapse? The GWR iron work continues to rust away, window frames are rotting due to not being painted and a large patch of weeds greets visitors alighting from the trains. The original station building remains fenced off.

What is more disturbing is that Barry Museum - who have taken rooms inside the original building - have placed a large plastic hoarding on the exterior that has been secured by drilling holes into the brickwork. So, this grade 2 listed by CADW will forever have holes in the original Victorian brickwork once the hoarding is removed. Did they have planning permission for this? Where is the CADW (Welsh Government) inspectorate?

It’s all very different to Great Malvern station!

"Network Rail has worked with its contractor Murphy to replace overhead glazing, complete structural strengthening and repainting of the ornate ironwork on both of the station's platform canopies."

I have attached some photos below to illustrate the points mentioned above.
 

Attachments

  • BARRY ISLAND STATION - TRACKSIDE (1).jpeg
    BARRY ISLAND STATION - TRACKSIDE (1).jpeg
    452.9 KB · Views: 307
  • BARRY ISLAND STATION - WEEDZONE (1).jpeg
    BARRY ISLAND STATION - WEEDZONE (1).jpeg
    447 KB · Views: 305
  • BARRY ISLAND STATION - CORRODED IRONWORK (1).jpeg
    BARRY ISLAND STATION - CORRODED IRONWORK (1).jpeg
    560.6 KB · Views: 287
  • BARRY ISLAND STATION - ROTTING WINDOWS (1).jpeg
    BARRY ISLAND STATION - ROTTING WINDOWS (1).jpeg
    375 KB · Views: 295
  • BARRY ISLAND STATION - BANNER ATTACHED TO FACADE (1).jpeg
    BARRY ISLAND STATION - BANNER ATTACHED TO FACADE (1).jpeg
    571 KB · Views: 295
  • BARRY ISLAND STATION - HOLES DRILLED INTO BRICKS (1).jpeg
    BARRY ISLAND STATION - HOLES DRILLED INTO BRICKS (1).jpeg
    674.7 KB · Views: 295
  • BARRY ISLAND STATION - RUSTING GWR IRONWORK (1).jpeg
    BARRY ISLAND STATION - RUSTING GWR IRONWORK (1).jpeg
    514.9 KB · Views: 311
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Brush 4

Member
Joined
25 Nov 2018
Messages
717
I thought I read somewhere a couple of years ago that the closed part was being reopened by GWR. Obviously not....
 

VR494

Member
Joined
22 Jan 2026
Messages
237
Location
United Kingdom
Sadly this is a common sight now across the network, Pontypridd station is another station that has been left to the elements too.
The reality is, there is no extra capital, the budget is not big enough to cover the costs of owning the CVL and maintaining it, alongside running a fleet of expensive trains, staff wages and other various things that have no relation to running a railway.

Hopefully it gets some attention soon, even reintroducing the second platform or improving the line speeds in and out of Barry Island would be a massive step forward.
 

Cardiff123

Established Member
Joined
10 Mar 2013
Messages
1,652
Location
South Wales
Barry Island typifies the ridiculousness of rail infrastructure ownership and management in Wales.
TfW own the former Barry Tourist Railway bits - including the station building & sidings and the land for Barry Depot, whilst Network Rail own the operational track for passenger services and the passenger platform at Barry Island.
 
Last edited:

Brush 4

Member
Joined
25 Nov 2018
Messages
717
That may have been the gist of what I read a while back. Integrating the 2 and opening up the whole station. I said GWR when I meant TfW. it seems that TfW took over the whole station in 2022. It is also listed.
 
Last edited:

VR494

Member
Joined
22 Jan 2026
Messages
237
Location
United Kingdom
That may have been the gist of what I read a while back. Integrating the 2 and opening up the whole station. I said GWR when I meant TfW. it seems that TfW took over the whole station in 2022. It is also listed.
It's quite clear the relationship between Amey and TFW has not been the best, the CVL despite being in public ownership is in serious decline. Overgrown weeds, unfixed track defects, crumbling structures, depots and mess rooms in a mess, it has the lot. Sadly Barry Island is not the only affected area. But never mind, atleast the money invested went to the right places, installing OLE on the Rhymney line.
 