• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Ashville new siding

Status
Not open for further replies.

dmkc

Member
Joined
9 Feb 2017
Messages
99
Was just looking at their site on Googly Maps, the aerial of which still shows that I believe is the old yard alignment.
Just noticed it looks like there is a shorter railhead just beyond Dan's gates - Wasn't sure if this was in use or?.....

1748780004618.png
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Bob figgis

Member
Joined
11 Apr 2020
Messages
154
Location
Tinsley TMD
That’s their old yard they had to vacate around a year ago. Asheville took regular trains in there of stone and sand. The lease ended and they moved next door to the current yard.
 

Adrian Barr

Member
Joined
2 Jul 2020
Messages
756
Location
Doncaster
Just noticed it looks like there is a shorter railhead just beyond Dan's gates

The main siding used for offloading in the old yard could hold 18 wagons. The shorter siding marked in red was their secondary line - any train longer than 18 wagons had to be split, with the extra wagons placed on that line and then shunted around later to get them in position for offloading. It's explained in the first two or three minutes of this video:

How to Offload a Freight Train in 3hrs and Avoid a £20k Fine!​

 

Wyrleybart

Established Member
Joined
29 Mar 2020
Messages
2,612
Location
South Staffordshire
Thanks very much for that Adrian Barr. Makes a lot of sense because I didn't realise how "near" the operation is, apart from Stewartby. How do trains get route from West Drayton to Stewartby ? via Willesden and Bletchley maybe ?
 

dmkc

Member
Joined
9 Feb 2017
Messages
99
I had no idea at all that his old and new yards were so close to each other - You will have heard a penny drop as a result! :)
 

Adrian Barr

Member
Joined
2 Jul 2020
Messages
756
Location
Doncaster
How do trains get route from West Drayton to Stewartby ? via Willesden and Bletchley maybe ?

Yes, they run to Acton Yard first, then up to Acton Wells Jn, along the freight line to Acton Canal Wharf Jn, drop down past the old Willesden Euroterminal onto the goods lines beside the West Coast Mainline at Willesden, then underneath the WCML and past Wembley yard on the goods lines to join the slow lines near Wembley Central and on to Bletchley.

The Acton - Wembley bit of the route can be seen here (filmed around 2018):

Acton Yard to Wembley Yard Loco Sidings | Freight Rambler
 

dmkc

Member
Joined
9 Feb 2017
Messages
99
Dan makes some reference to the 153 in today's weekly - Unit still being held pending movement to the yard but planning hoops to jump through etc etc - Good of him to see a few people had been asking in the comments :)
 

Wyrleybart

Established Member
Joined
29 Mar 2020
Messages
2,612
Location
South Staffordshire
Dan makes some reference to the 153 in today's weekly - Unit still being held pending movement to the yard but planning hoops to jump through etc etc - Good of him to see a few people had been asking in the comments :)
Daniel also talking about a kind of potential rail staff recruitment day, as well as getting fired up about GBRf's 99001 delivery. Also had to cancel a train because he didn't have enough material to go in.
 
Status
Not open for further replies.

Top