Here's an idea that's just come into my head.
Instead of building Birmingham Curzon Street as the Birmingham terminus for HS2, why not run HS2 trains into New Street (better for connection passengers) and create extra capacity at the station by moving existing services from it.
This can by done by:
Revitalising plans from the mid 1990's and having Crossrail style deep tunnels running from Duddeston to Five Ways for the Cross City line with lower level platforms underneath New Street. This probably would require a diveunder just south of Five Ways station so that northbound cross city trains can access their new alignment without affecting south bound Cross Country and regional trains. Five Ways station would be re-built on the waste-ground immediately to the east of its current location. This frees up platforms 8 & 11 at New Street.
Build 4 new terminus platforms at Moor Street on a viaduct immediately to the South East of the point where the approach tracks to New Street and the platforms at Moor Street meet. Completely re-develop Moor Street station, get rid of the GW architecture and link it to the Bull Ring (and New Street) by a bridge over Moor Street Queensway (might require the relocation of an escalator next to Selfrages).
Although it would involve the demolition of some industrial buildings in the eastside of Birmingham, these terminus platforms link to the main cross country tracks just to the east of Proof House junction and would be used by Cross Country regional services (1tph to Stanstead Airport, 2tph to Leicester, 2tph to Nottingham and 1tph to Tamworth and possibly 2tph to Wolverhampton via Walsall and the Sutton Park Line). Regrettably the Cardiff-Nottingham service will have to be split in two (although it could only require a simple change at Moor Street if the Cardiff service is re-directed into Snow Hill once the Bordesley cord is built) and the proposed Tamworth/Leicester-Worcester/Hereford cross city service would no longer be possible. This could release another 2 or 3 platforms at New Street.
With theses services removed from New Street and the Cross city line running in tunnels, some west coast services from London and Coventry could move onto a new alignment at Proof House Junction and use platforms 7-12 at New Street.
HS2 trains could then enter New Street on the current West Coast tracks and use platforms 1-6. Some West Coast and local trains (Walsall-Wolverhampton stoppers) will continue to use these platforms as there will only be four HS2 trains per hour running into New Street (6 when the lines to Manchester and Leeds are open). HS2 trains would move to their own alignment immediately to the east of Proof House junction (just after the flyover) so that the other tracks can shift to their new alignments as mentioned above.
This may create a problems with some West Coast trains that don't start or terminate at New Street (the hourly Wolverhampton - Euston service Chase line and ATW from the airport) having to cross the cross country lines at the south east of the station to get to the Wolverhampton lines, but that will be less of an issue when cross city trains are removed from New Street.
And there are other issues that will need to be thought about such as platform lengths and trains coming from the Wolverhampton lines that terminate at New Street (Shrewsbury, Liverpool etc...)
What do people think of my idea, and would it be a more practical and cheaper alternative to building an expensive new station at Curzon Street?
Instead of building Birmingham Curzon Street as the Birmingham terminus for HS2, why not run HS2 trains into New Street (better for connection passengers) and create extra capacity at the station by moving existing services from it.
This can by done by:
Revitalising plans from the mid 1990's and having Crossrail style deep tunnels running from Duddeston to Five Ways for the Cross City line with lower level platforms underneath New Street. This probably would require a diveunder just south of Five Ways station so that northbound cross city trains can access their new alignment without affecting south bound Cross Country and regional trains. Five Ways station would be re-built on the waste-ground immediately to the east of its current location. This frees up platforms 8 & 11 at New Street.
Build 4 new terminus platforms at Moor Street on a viaduct immediately to the South East of the point where the approach tracks to New Street and the platforms at Moor Street meet. Completely re-develop Moor Street station, get rid of the GW architecture and link it to the Bull Ring (and New Street) by a bridge over Moor Street Queensway (might require the relocation of an escalator next to Selfrages).
Although it would involve the demolition of some industrial buildings in the eastside of Birmingham, these terminus platforms link to the main cross country tracks just to the east of Proof House junction and would be used by Cross Country regional services (1tph to Stanstead Airport, 2tph to Leicester, 2tph to Nottingham and 1tph to Tamworth and possibly 2tph to Wolverhampton via Walsall and the Sutton Park Line). Regrettably the Cardiff-Nottingham service will have to be split in two (although it could only require a simple change at Moor Street if the Cardiff service is re-directed into Snow Hill once the Bordesley cord is built) and the proposed Tamworth/Leicester-Worcester/Hereford cross city service would no longer be possible. This could release another 2 or 3 platforms at New Street.
With theses services removed from New Street and the Cross city line running in tunnels, some west coast services from London and Coventry could move onto a new alignment at Proof House Junction and use platforms 7-12 at New Street.
HS2 trains could then enter New Street on the current West Coast tracks and use platforms 1-6. Some West Coast and local trains (Walsall-Wolverhampton stoppers) will continue to use these platforms as there will only be four HS2 trains per hour running into New Street (6 when the lines to Manchester and Leeds are open). HS2 trains would move to their own alignment immediately to the east of Proof House junction (just after the flyover) so that the other tracks can shift to their new alignments as mentioned above.
This may create a problems with some West Coast trains that don't start or terminate at New Street (the hourly Wolverhampton - Euston service Chase line and ATW from the airport) having to cross the cross country lines at the south east of the station to get to the Wolverhampton lines, but that will be less of an issue when cross city trains are removed from New Street.
And there are other issues that will need to be thought about such as platform lengths and trains coming from the Wolverhampton lines that terminate at New Street (Shrewsbury, Liverpool etc...)
What do people think of my idea, and would it be a more practical and cheaper alternative to building an expensive new station at Curzon Street?