I agree. its not easy to fit them all in. I also havent checked in detail the paths from Cardiff-Swansea and return but just done a rough estimate. A few might clash with Maestegs so might have to run a bit later and have a shorter turn around in Swansea. Also I havent looked into the issue of platfom space at Swansea. With 2 platforms used for Swanline/HOWL services that sit in Swansea for some time and the existing West Wales services being split at Swansea every 2 hours it could be tight. All these things would need to be looked into more.You can see the stress that trying to create the 07:45 caused. Though, I worked around it by splitting the 2 units from 1W12 to form both 1W11 and 1W12 as far as Shrewsbury.
Keeping the current West Wales continuing to Cardiff also makes sense. The Mk4 can run in front of the present service. Presumably, it would then not matter if the 197 was a 2-car.