• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

A Crossrail 3 Idea: Victoria to West Hampstead/Chiltern line

DynamicSpirit

Established Member
Joined
12 Apr 2012
Messages
9,215
Location
SE London
I'm wondering if this would work as an idea for a future Crossrail 3: As shown in the map:

Tunnel from Victoria, heading up to Hyde Park Corner, Marble Arch, Edgware Road, Kilburn High Road, where the line would divide. One tunnel would head up to West Hampstead, Golders Green and on to possible destinations in North London, perhaps around and a bit beyond Finchley. The other would head NW and emerge to join the National Rail Chiltern line, probably somewhere near Willesden Green.

This line would then absorb quite a few of the Southern metro services from Victoria, turning them into cross-London trains. Some of those could then provide a stopping service to West Ruislip along the Chiltern line via Wembley Stadium, or take over the Marylebone-Aylesbury services.

I'm conscious that in previous discussions, it's been said in these forums that once Crossrail 2 is built, there will be no room under central London for any more railway tunnels. I think this proposal avoids that problem by steering the line a bit further West, so it avoids the places that are most crowded with multiple existing tube lines, while still providing lots of new interchanges. At Victoria, it would route completely to the West of the existing Victoria line - so it could presumably be built with platforms at the same depth as the Victoria line, avoiding conflicts with Crossrail2 (which crosses the Victoria line there so I would assume must be planned to be built at a different depth).

Thoughts? I don't think there's any doubt that this would be useful, but would it be possible/practicable to build?

Crossrail3.jpg
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,548
Location
Taunton or Kent
I suspect a big challenge will be where the tunnel portals go. Nowhere between the river and Clapham Junction looks suitable. It might be possible to tunnel from the bottom of Grosvenor bank and take out the western carriage sidings and high-end platform numbers, but this would be very disruptive and is on the wrong side for metro services as things stand. There might be some industrial estate land that could be used around Neasden for the NW portal, with the station becoming a large hub in conjunction with existing lines and the new West London Orbital.
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,891
Location
Cambridge
If this did happen I reckon it’d be the beginning of the end for Marylebone.

You’d probably end up with these Crossrail 3 trains serving all stations to Aylesbury and to High Wycombe or Princes Risborough, and then Oxford and Birmingham services running from Old Oak Common or something, non stop to High Wycombe, Princes Risborough or beyond.

I don’t however consider that altogether a bad thing.

== Doublepost prevention - post automatically merged: ==

I suspect a big challenge will be where the tunnel portals go. Nowhere between the river and Clapham Junction looks suitable. It might be possible to tunnel from the bottom of Grosvenor bank and take out the western carriage sidings and high-end platform numbers, but this would be very disruptive and is on the wrong side for metro services as things stand. There might be some industrial estate land that could be used around Neasden for the NW portal, with the station becoming a large hub in conjunction with existing lines and the new West London Orbital.
I think you could possibly do it by closing Battersea Park‘s existing station and having the slow lines run straight into a portal where the slow lines and platform space is now, serving Battersea Park underground.
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,548
Location
Taunton or Kent
If this did happen I reckon it’d be the beginning of the end for Marylebone.

You’d probably end up with these Crossrail 3 trains serving all stations to Aylesbury and to High Wycombe or Princes Risborough, and then Oxford and Birmingham services running from Old Oak Common or something, non stop to High Wycombe, Princes Risborough or beyond.

I don’t however consider that altogether a bad thing.
If Marylebone closed it might be possible to have the northern portal basically takeover the current station approach area, with Marylebone having Crossrail platforms more or less underneath the existing station converted into a large concourse with shopping/markets, etc. However this would mean for around a year or two absolutely no trains could run through here, so would at a minimum require Old Oak Common to be ready with Chiltern services. This isn't unreasonable though given such a scheme being proposed now is unlikely to lead to shovels in the ground before OOC opens to non-HS2 services.
I think you could possibly do it by closing Battersea Park‘s existing station and having the slow lines run straight into a portal where the slow lines and platform space is now, serving Battersea Park underground.
Having a better look there is another possibility: start the tunnels between Wandsworth Common and Clapham Junction, where some football pitch land on the slow line side could be bought up for this. This would be far less disruptive than any portal devised further towards Victoria, however would come at the cost of longer tunnelling and at least two more stations having underground platforms. On the plus side though, this could allow Battersea Park's above ground platforms to close, and Clapham Junction could be remodelled to allow more fast trains to call, if two platforms in each direction are able to share an island for this purpose.
 

DynamicSpirit

Established Member
Joined
12 Apr 2012
Messages
9,215
Location
SE London
If Marylebone closed it might be possible to have the northern portal basically takeover the current station approach area, with Marylebone having Crossrail platforms more or less underneath the existing station converted into a large concourse with shopping/markets, etc. However this would mean for around a year or two absolutely no trains could run through here, so would at a minimum require Old Oak Common to be ready with Chiltern services. This isn't unreasonable though given such a scheme being proposed now is unlikely to lead to shovels in the ground before OOC opens to non-HS2 services.

Building it that way does have the advantage of minimising new tunnels, since you can in effect use the existing line from Marylebone. But if all trains go that way, you're losing the ability to run a branch up towards Finchley. It would mean all CR3 trains would have to run along Chiltern lines, which might mean you struggle to find enough places for the trains to go at the Northern end. Also Marylebone isn't such a useful interchange as Edgware Road for the station in that area, since it lacks Circle/H&C connections.

== Doublepost prevention - post automatically merged: ==

If this did happen I reckon it’d be the beginning of the end for Marylebone.

You’d probably end up with these Crossrail 3 trains serving all stations to Aylesbury and to High Wycombe or Princes Risborough, and then Oxford and Birmingham services running from Old Oak Common or something, non stop to High Wycombe, Princes Risborough or beyond.

I don’t however consider that altogether a bad thing.

The thought had occurred to me too. Marylebone is a lovely station, but arguably the least useful/worst connected of all London termini, so in practical terms I agree that it probably wouldn't be a bad thing if all Chiltern services went instead to CR3/OOC.
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,548
Location
Taunton or Kent
Building it that way does have the advantage of minimising new tunnels, since you can in effect use the existing line from Marylebone. But if all trains go that way, you're losing the ability to run a branch up towards Finchley. It would mean all CR3 trains would have to run along Chiltern lines, which might mean you struggle to find enough places for the trains to go at the Northern end. Also Marylebone isn't such a useful interchange as Edgware Road for the station in that area, since it lacks Circle/H&C connections.
I'd like to think that a new Crossrail station at Marylebone would combine with Baker Street nearby to provide an enlarged interchange, similar to how the Elizabeth Line serves Liverpool Street and Moorgate in one station.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,224
Location
West Wiltshire
Towards the end of WW2 there was a rail route plan for London.

There was a priority route 8 (basically Vauxhall, Victoria, West End, Euston, Kings Cross, Highbury, which was actually built in form of Victoria Line)

Route 12B was lower priority, but was proposed from Clapham Junction, Royal Hospital Road, Sloane Street to Baker Street and onwards

Route 3 linked the approaches to London Bridge via City, followed Central line to about where Elizabeth lines Bond Street (Hanover Square station) has been built, then curved up to Marylebone joining route onwards.

Effectively joining combination of bits of these 3 lines (listed above) proposed 81 years ago. But would make sense to have more crossrail routes
 

The Pelican

Member
Joined
3 Oct 2025
Messages
427
Location
London
This 2011 London Reconnections article discusses BR's 1980s proposals for a variety of Victoria or Blackfriars Crossrail lines to a series of northern termini including Paddington and Kings Cross St Pancras.


Arguably, the best route for a crossrail line from the North West of London would be to follow the fleet line corridor, from a rebuilt (or redrilled) Charing Cross Jubilee Line through Fleet Street, City Thameslink and then either Fenchurch Street or London Bridge.
 

Wolfie

Established Member
Joined
17 Aug 2010
Messages
7,437
Building it that way does have the advantage of minimising new tunnels, since you can in effect use the existing line from Marylebone. But if all trains go that way, you're losing the ability to run a branch up towards Finchley. It would mean all CR3 trains would have to run along Chiltern lines, which might mean you struggle to find enough places for the trains to go at the Northern end. Also Marylebone isn't such a useful interchange as Edgware Road for the station in that area, since it lacks Circle/H&C connections.

== Doublepost prevention - post automatically merged: ==



The thought had occurred to me too. Marylebone is a lovely station, but arguably the least useful/worst connected of all London termini, so in practical terms I agree that it probably wouldn't be a bad thing if all Chiltern services went instead to CR3/OOC.
Re your last para, Fenchurch Street is up there too.

== Doublepost prevention - post automatically merged: ==

I'd like to think that a new Crossrail station at Marylebone would combine with Baker Street nearby to provide an enlarged interchange, similar to how the Elizabeth Line serves Liverpool Street and Moorgate in one station.
That should be a given. See also the plans for Euston/Kings Cross/St Pancras on CR2.
 

md2016

Member
Joined
3 Feb 2023
Messages
48
Location
Haddenham
Building it that way does have the advantage of minimising new tunnels, since you can in effect use the existing line from Marylebone. But if all trains go that way, you're losing the ability to run a branch up towards Finchley. It would mean all CR3 trains would have to run along Chiltern lines, which might mean you struggle to find enough places for the trains to go at the Northern end. Also Marylebone isn't such a useful interchange as Edgware Road for the station in that area, since it lacks Circle/H&C connections.

== Doublepost prevention - post automatically merged: ==



The thought had occurred to me too. Marylebone is a lovely station, but arguably the least useful/worst connected of all London termini, so in practical terms I agree that it probably wouldn't be a bad thing if all Chiltern services went instead to CR3/OOC.

With your plan I’d ensure the High Wycombe branch also stopped at West Hampstead, given the existing Chiltern essentially runs alongside it, and your plan cuts off access to the Jubilee via the short walk to Baker Street.

All the extra tunnelling to Edgware Road and not using the existing line to High Wycombe, feels like it adds cost and unless you’re going to merge the Edgware Road stations, feels like there would probably be far greater benefits by linking it with Paddington and Crossrail, even if the costs of deep tunnelling would be significant.

Although I’d have thought a larger Baker Street interchange makes much more sense than either of these options. Then routing down using a very similar line to Victoria.

If they need to prove their growth credentials, they could run the line to Bicester, connecting it to Knightsbridge, Oxford Street and Mayfair for more tax free shopping or whatever.
 
Last edited:

NCT

Established Member
Joined
18 Apr 2025
Messages
2,322
Location
London
There isn't enough civilisation along the Chiltern for a Crossrail. Or, put it another way, Chiltern already has the Metropolitan as its Crossrail.

Assuming Crossrail 2 serving the Lea Valley is a given, on the north side of the river, the next Crossrail candidate is actually an existing Cross route - Shenfield. This route will need a full Crossrail rather than a half Crossrail, same as the Abbey Wood branch.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,952
The Crossrail 2 station for Victoria is safeguarded all along the west side. Depth is not just about the running tinnels, but the station boxes and everything that goes with it. Having seen the Victoria expansion works first hand during construction, I personally can’t see how you could build another Crossrail type station down there after Crossrail 2.

Similalry there’s not s lot of space around Edgware Road / Baker St, and finding somewhere for the station boxes there around the Bakerloo / Circle / Met / Jubilee / everything else will I suspect be a great challenge.

The portals are another issue. Not least how you build them without being very disruptive to the train service, for example…

I think you could possibly do it by closing Battersea Park‘s existing station and having the slow lines run straight into a portal where the slow lines and platform space is now, serving Battersea Park underground.

… this suggestion would mean no metro services to Victoria (and thus reduced metro services overall) for several years.

Marble Arch would also need a massive rebuild, as that would be the interchange point for much of the West end and the City.

It would have to take all the Southern Metro services into Victoria, and then some more, to have a viable service in the core.

Having said all that, compared to many suggestions (including by former Mayors) it does have some merit in constructability, because it crosses the edge of the Central Business District rather than crosses it. But that then brings its own issues with potential usage.
 
Last edited:

Top