5Q89 Delayed on Saturday 9/9/2023

Status
Not open for further replies.

61058

Member
Joined
16 Jul 2012
Messages
46
On Saturday 9/9/2023 5Q89 Slade Green to Doncaster Wagon Works was diverted via Lincoln at
short notice.It was 24 minutes late at Peterborough & 219 late at Doncaster.
When I saw it at Lincoln at 1715 it was stationary blocking Sincil Bank level crossing and had
not pulled up to the signal in the station. I was not able to stop at the time but the driver appeared
to be out of the cab.the consist was 66701 2 green translator vans & an emu (unidentified).
Does anybody know the problem was?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Joined
3 Aug 2021
Messages
831
Location
Glasgow
On Saturday 9/9/2023 5Q89 Slade Green to Doncaster Wagon Works was diverted via Lincoln at
short notice.It was 24 minutes late at Peterborough & 219 late at Doncaster.
When I saw it at Lincoln at 1715 it was stationary blocking Sincil Bank level crossing and had
not pulled up to the signal in the station. I was not able to stop at the time but the driver appeared
to be out of the cab.the consist was 66701 2 green translator vans & an emu (unidentified).
Does anybody know the problem was?

Can't explain the diversion but came to a stand due to a loss of brake pressure.
Maintenance identified a problem with a translator vehicle
 

61058

Member
Joined
16 Jul 2012
Messages
46
Can't explain the diversion but came to a stand due to a loss of brake pressure.
Maintenance identified a problem with a translator vehicle
I assumed they had a problem.It seems to have delayed other trains around Lincoln as well.
 