• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

319s Caught Short!

Status
Not open for further replies.

class 313

Established Member
Joined
10 Dec 2005
Messages
6,475
Location
St Albans
Today I was on the 0720 to Kings Cross to go to the MNR, I was going to get the 0733 to Kings cross then onto London Liverpool St, but I thought I would get the earlier train just in case there was delay.

Journey was fine, got over Radlett Jnc nice and smoothly, got down to Cricklewood and was preparing myself for Kings Cross, we go over a junction south of the station. There was more bouncing than usual and noises from the pantograph above (I was in the pantograph car of course). We then slow down to a halt, thinking this was strange but knowing there was signals nearby I just ignored it, until the lights went out leaving just the emergency ones on. Knowing this was probably just due to power loss I was waiting for the driver to announce he was just going to reset the train. He walked down through the first 319, then into rear (which I was in), he checked the control box between the Pantograph car and the Toilet car. Muttering to himself he went back to the cab. He tried to reset the panto but you could hear something was wrong, so he went back to the first 319's cab.

Another 319 pulled up against us on the down slow as we were on the down fast, the driver looked at the panto, and was shocked then laughed, he then moved on to the first 319 to speak to driver to tell him what state the pantographs where in.

Our driver came out to look for himself, he was not pleased as this was his first major brake down. NR staff later came along to organise what was going to happen.

In the end another 319 pulled up on the freight line which splits the Down fast and the Up slow apart. The 319 stopped between both of the units, then they tried to think of a way to detrain us, in the end, one 319 at a time got evacuated by the cab doors, into the rear cab door of the rescuing 319. Taking well over 3/4 of a hour to do all this, we got reversed into Cricklewood CS then back onto the Down Slow to carry on the service to Brighton.

What a morning eh? And to add to that, I guess you could say the 319s had their pants down ;):D

Pics:- (more to come later)
The Rescuing 319

[URL=http://img444.imageshack.us/my.php?image=3195wm5.jpg] [/URL]
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

westcoaster

Established Member
Joined
4 Dec 2006
Messages
4,490
Location
DTOS A or B
tom you sure you was not on the up lines, if you were going to london? sounds interesting, did he loose the pan or just break it.
 

class 313

Established Member
Joined
10 Dec 2005
Messages
6,475
Location
St Albans
tom you sure you was not on the up lines, if you were going to london? sounds interesting, did he loose the pan or just break it.

First 319 had half a Panto left, the other had the connector (the bit that touches the wires) at a 45 degree angle to the Panto arm.

But going to London you Have the Up Fast (Platform 4), Down Fast (Platform 3), Up Slow (Platform 2), Down Slow (Platform 1).
 

TheSlash

Established Member
Joined
7 Jun 2005
Messages
2,336
Location
Marwell Zoo
Was the overhead damaged? If not then there is no reason why another 8 car couldn't provide assistance from the rear {yes, 16 coaches} non stop to Farringdon.
Drop the pantographs on the damaged units. Ratchet back the electrical connection boxes between the 2 8 cars and push the 'dead' 8 to Farringdon. Get the dead 8 onto the 3rd rail, fire up the DC selection, uncouple and away you go.
The 8 car would be ok to continue onto Brighton, giving control time to work out how to get it out for repairs
 

class 313

Established Member
Joined
10 Dec 2005
Messages
6,475
Location
St Albans
Was the overhead damaged? If not then there is no reason why another 8 car couldn't provide assistance from the rear {yes, 16 coaches} non stop to Farringdon.
Drop the pantographs on the damaged units. Ratchet back the electrical connection boxes between the 2 8 cars and push the 'dead' 8 to Farringdon. Get the dead 8 onto the 3rd rail, fire up the DC selection, uncouple and away you go.
The 8 car would be ok to continue onto Brighton, giving control time to work out how to get it out for repairs

The OHL was ****ed yes, the units were still there by 8pm. and both Pantos where lowered due to safety.
 

16CSVT2700

Established Member
Joined
4 Sep 2005
Messages
1,837
Location
Gdansk
But going to London you Have the Up Fast (Platform 4), Down Fast (Platform 3), Up Slow (Platform 2), Down Slow (Platform 1).
Quail Book 4 disagrees.
Platform 1: Up Slow (southbound)
Platform 2: Dn Slow (northbound)
Platform 3: Up Fast (southbound)
Platform 4: Dn Fast (northbound)
 

Ascot

Established Member
Joined
26 Nov 2005
Messages
3,384
Location
Birmingham, UK
Sounds like a messed up day :lol:

Anyway at Cricklewood

It goes

UG
US (P1)
DS (P2)
UF (P3)
DF (P4)
UH
DH

In This Case UP is towards St Pancras (SPC)

Dated 23/06/07 LN3201.006 correct as to today.
 

ChrisCooper

Established Member
Joined
7 Sep 2005
Messages
1,787
Location
Loughborough
Actually, the Midland Railway used to consider "up" as towards Derby, which was their headquarters and a hub of their network.
 
Status
Not open for further replies.

Top