• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

1973 stock withdrawal

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Mawkie

Established Member
Joined
17 Feb 2016
Messages
1,253
210-610-410 was looking stripped and ready for removal at Northfields when I passed earlier today. No info on when it will be removed sadly.
Screenshot_2025-08-04-22-10-41-27_92460851df6f172a4592fca41cc2d2e6.jpg
 

LUYMun

Established Member
Joined
15 Jul 2018
Messages
1,375
Location
Cancelled
Still not sure where exactly they’re being scrapped at. Docklands has been suggested.
 

Thirteen

Established Member
Joined
3 Oct 2021
Messages
1,891
Location
London
I imagine the withdrawal is in being phased and it will increase once the 2024 stock rolls out.
 

absolutelymilk

Established Member
Joined
18 Jul 2015
Messages
1,587
Why are they being scrapped now, rather than after the leaf fall season when they seem to be short of trains? Is it so they can be used for spares for the trains in better working order?
 

bluegoblin7

Established Member
Joined
10 May 2011
Messages
2,116
Location
JB
The trains that have been scrapped have all been stopped for a significant period of time with numerous parts removed, and would not be viable to return to service.
 

A60stock

Member
Joined
26 Aug 2019
Messages
229
Location
London
Sort of off topic but I had a query regarding when these trains were refurbished:

As those who are familiar with the stock all know, when the 73ts doors close, there is a distinct air whoosh/rush sound just before the doors actually close following the chimes sounding.

Were the door motors/opening/closing speed of the doors amended? I ask because in videos of the un-refurbished stock, you can barely hears the "Air whoosh" when the doors close and I thought maybe its because the video sound quality doesn't compare with videos of today. However, there is a video online taken in 1999 which shows both an un-refurburshed example and refurbished example leaving Ealing Common and you can clearly hear the "whoosh" sound just as the doors close on the refurbished unit but not so much on the un-refurbished one. So it seems like something was changed.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,039
Location
West Wiltshire
A tender has been issued as a framework for disposal of rolling stock over 8 years (with extra 4 year option to allow for delays) covering Piccadilly line (estimated £7m), Bakerloo 72 stock (estimated £3m) and Heavy haul vehicles (£1m), the later 2 subject to replacement stock being ordered

1 buyer​

Description​

This notice is to inform the market of an upcoming procurement event for the rolling stock disposal framework, which will include services. London Underground (LUL) requires removal via rail and/or road, decommission and disposal of a number of aging rolling stock assets/fleets.
LUL's pipeline of anticipated rolling stock disposal to be awarded through this framework includes: Piccadilly Line 73TS rolling stock (approximately £7m), Bakerloo Line 72TS rolling stock (approximately £3m); and Heavy Haulage Vehicles (HHV) (approximately £1m). It is estimated that the total value of projects on the framework will be approximately £11m. Bakerloo Line upgrade and HHV projects will be subject to relevant future funding approvals.
London Underground has purchased new rolling stock for the Piccadilly Line in order to replace the existing 73TS Fleet and is also currently planning projects to upgrade the Bakerloo Line Upgrade (BLU) which would include replacing the 72TS rolling stock, and further projects looking at updating LUL's fleet of heavy haulage vehicles (HHV). Both the BLU and HHV projects are in the early stages and are subject to London Underground securing the required funding. If these projects proceed the disposals of the rolling stock will be required.
The core scope includes removal of rolling stock from LUL's sites, and transport to an off-site location (provided by the supplier). At the offsite location the rolling stock will be decommissioned by the supplier, this will involve the rolling stock cars being decoupled and hazardous waste contained, removed, and disposed of. Once all hazardous materials have been removed the remaining recyclable material from each car will be removed, weighed, and issued for recycling or re-use. All remaining materials, both hazardous and non-hazardous will then be scrapped as waste. The PLU fleet removal is due to commence for scrapping in early summer 2026 concluding in the late 2027.
The contract is a bespoke Framework Agreement with two lots based on the different methods of haulage/removal (Road and Rail), a maximum of three (3) suppliers are to be selected per each lot. To achieve this, LUL will be conducting a competitive tender for this framework which shall have an initial term of eight (8) years, with an option to extend for further four (4) years based upon acceptable operational and commercial performance as set out in the framework. The maximum framework length will therefore be twelve (12) years.
The framework will include a mini competition procedure (call-off contracts) which will be evaluated on price only for services. Each request for a proposal for the mini competitions will be issued on a batched basis. LUL's expectation is that no more than 5 trains will be included in each batch. Each batch will have a clearly specified collection date and location depending on the haulage/removal requirement. LUL will have control over the required mode of transport when specifying the collection location at request for proposal (call-off) stage.
The framework also reserves the right for Direct Award. The framework also includes a 'scrap value rebate' mechanism under which LUL will receive from the suppliers based on the realised value of the scrap materials - in order to align with Tax guidance from HMRC, the scrap value will be returned to LUL as a separate incoming transaction (rather than offset against the cost of services).


 

Busman

Member
Joined
4 Mar 2017
Messages
136
Anyone worried about the 73s being removed I wouldn't worry as they'll be around until at least 2030 as the new train rollout is obviously being managed by TfL who, like everything they touch, either gets massively delayed or cancelled. They still blaming Covid?

Yet another delay, much like the DLR rollout.
 

erikvd28

Member
Joined
14 Apr 2025
Messages
41
Location
Netherlands

Old Piccadilly line trains to be cannibalised to keep Bakerloo line running​


When the Piccadilly line’s new trains start carrying passengers later next year, some of the replaced trains will be used to keep the ageing Bakerloo line running.
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,784
Location
Somewhere, not in London
So the parts that go via Railway Engineering Workshops in Acton will continue to float between fleets like they always have. I’m shocked, shocked I tell you!!!
 

Wolfie

Established Member
Joined
17 Aug 2010
Messages
7,395
In the least surprising news ever it is being reported in London that withdrawn 1973 stock will be harvested of parts to keep initially remaining 1973 stock and later, for suitable parts, 1972 stock running.

== Doublepost prevention - post automatically merged: ==

So the parts that go via Railway Engineering Workshops in Acton will continue to float between fleets like they always have. I’m shocked, shocked I tell you!!!
The sarcasm is strong in this one, lol....
 

Mawkie

Established Member
Joined
17 Feb 2016
Messages
1,253
Ianvisits was a bit light on detail.

What parts are interchangeable between 72 and 73 stock?
 
Status
Not open for further replies.

Top