Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
LNER is still running Mk4/Class 91 sets, albeit two coaches shorter than in the past. So push-pull is still there. It just needs more coaches to be economically viable.
To come back to the issue of setting up charging, in itself there may be the possibility of relocating premises to near(er) a substation, slowly-charged storage batteries that discharge rapidly when a vehicle needs to be recharged, using solar (and/or other micro-generation), or some combination...
What is worse is that while there was no service for a large part of the day stopping st Chester-le-Street, freight and OAO services seemed to be passing through. At minimum that makes the railway look bad. The contingency plans do need to be reviewed to maintain services to all future-GBR...
Surely, just in general terms of the information system, the signaller should know or be able to find out whether or not the train has gone beyond/outside a movement authority (especially if it is SPAD-equivalent) without the need for any information from the driver?
As to why the tunnels are so susceptible, is it their square shape? The Wikipedia article on Gateshead Interchange (https://en.wikipedia.org/wiki/Gateshead_Interchange) claims that "the running tunnels are square". Is there some underlying design issue there?
(section of article)
That's one of the two possible locations for the crossing, cross-checking with other maps including https://www.openstreetmap.org/#map=19/54.960827/-1.598371 , this leads to https://maps.app.goo.gl/r1M7WXX5TN8NxKce9 might be the point where the Metro Line passes underneath. There is also what...
The 2022 bit seems to be a statutory instrument, and explicitly applies to England.
https://www.legislation.gov.uk/uksi/2022/1094/regulation/1/made
ScotRail would have a lot of "paperwork" to do to catch up before they were able to issue penalty fares anyway.
And compatibility from a driver's standpoint so that existing traction knowledge covers the new train? It should not be too hard for the legal department to define traction knowledge and specify it as a compatibility requirement in the tender.
Perceived speed often does not match reality. It is an interesting subject, perhaps in this case it corresponds to an honest mismatch between perception and reality. The investigators will deal with that in due course.
I'm sure they could find something else, like Byelaw 2(1):
(Extract from https://www.gov.uk/government/publications/railway-byelaws/railway-byelaws )
That could be applied to a 'vape' while it is being used. Then there is the notorious 8(6), "comfort and convenience" IIRC
It's getting ridiculous. They are even suppressing platform numbers for the Overground (to be Lioness) services, even though they can only realistically run from two adjacent platforms (9 and 10, due to having third rail) in practice and it is quite possible simply to head straight for those...
It seems to be heading that way. LNER would do well to make sure that they have useable access to the whole Hertford Loop, with crew training etc. (also it would be useful as an extra access route to Bounds Green depot).
I just looked at the NRES map of Brighton station on the National Rail Enquiries website, and while that map is diagrammatic it does seem like there isn't a lot of room.
Link...
It also causes problems - it's not much fun when you've got a large black americano (coffee) in your hand and you have to deal with a whole horde at once.
If you use RTT advance mode, you can get the headcode and you can use that on traksy.uk (mpas side) or OpenTrainTimes maps (and others may...
Euston have even started doing that with London Overground, which is something of an exercise in futility since there are only two platforms that it can realistically use (9 and 10, with third rail) without having to do a power changeover.
I did once "talk" my sister (over WhatsApp text) to an...
The section (edit: of the Leamside Line) south of the Victoria Viaduct would be mostly useful for speed, the problem would be the curves on the viaduct approach; from about there onwards any worthwhile high-speed cutoff would need a new alignment anyway.
Based on what I have read on other threads, I suspect that there is an attempt to route passengers away from the Midland Main Line/EMR side of St Pancras as much as any desire to conserve revenue, although both are possible factors. The thing that is most jarring is the lack of transparency...
We are aware of an issue with emails from the Forum to Microsoft-based email accounts (hotmail/outlook/live.com email addresses). This is being looked into currently, thanks for your patience meanwhile.