    What the blazes is going on the ECML?

    It all kicked off with the discovery of a cracked crossing nose in the main to main crossover at Tallington. This closed the Down Fast while emergency repairs were caried out. This left the Down Slow available for all Northbound trains and when a freight train was routed that way, it broke down...
  2. S

    Drayton Park disused sidings.

    I am led to believe there is some demolition work going on at Queensland Road. I am also led to believe that some remedial work is being done to the roof of the DC traction supply building.
  3. S

    Tows

    In response to Ajax 103's question(s) I might be able to shed some light on the TOWS through there. I think the Sectional Appendix might be slighty out of step with reality in this location, but that can only be confirmed or disputed by the author of that document. In reality, there is a TOWS...
  4. S

    NX Panel - Ground Frame Releases

    We spoke about this over a year ago, OT. I haven't had chance to make contact with the gentleman yet, as it is getting harder for me to "Escape" for a day to investigate new technology. I do, however, have contact with another firm who are very close by, and might have the opportunity to...
  5. S

    NX Panel - Ground Frame Releases

    No, I haven't. I ordered a boxful of button repair kits about three years ago, and got the standard type of button in the kits. Interestingly, the stirrup contacts are now alloy vice brass. The chunky ones(Swisstacs) are not my favourite button-they are very easy to break, as well as...
  6. S

    NX Panel - Ground Frame Releases

    That's just a bit of banter between two professional railway men-there ain't gonna be a fight!! Mr Locke, if it is any help I might be able to help you with part numbers for the Domino components. They are all still available. Regards, SF123.
  7. S

    NX Panel - Ground Frame Releases

    Actually, not wanting to splt hairs, Kings Cross panel is a Henry Williams panel!! Which in turn is connected to either:- 1/. A GEC interlocking(Kings Cross) 2/. A TDM system(to all other interlockings on the Kings Cross control area).
  8. S

    NX Panel - Ground Frame Releases

    The Ground Frame switch can be identified by it's colour-brown. It has two positions-Normal and Reverse. There are three indications-Normal, Free and Reverse. With the Ground Frame release switch in the Normal position, a Normal indication can be expected, provided the Ground Frame is...
  9. S

    Line id

    And 1200 and 2100 are called T.I.D's in the new Ellipse maintenance system. Each line has a T.I.D. and the Up Slow might be 1100, the Up Fast 1200, etc. Don't quote me on those numbers, as I have used them as an example. If I was at work today I could have got out a piece of paper with them...
  10. S

    Are there still level crossings on the East Coast Main Line?

    Yes, there are plenty of level crosings on the ECML. A variety of MB's, CCTV's MSL's and even a set of Keylocked mechanical gates.
  11. S

    Flashing Colour Signal Lights

    They are still there! They are still flashing merrily away! New England North to Stoke Junction.
  12. S

    Flashing Colour Signal Lights

    They are still there! New England North to Stoke Jcn.
  13. S

    NXEC & GC Updates/News

    I wonder if anybody has considered the impact on Kings Cross signal interlocking that re-numbering of the platforms will have.:o
  14. S

    Is it time to clean up the tracks?

    I can't see it getting any better in the short term, especially with talk about renewing a set of points in an 8 hour possession. It'll be a case of "Chuck the new points in and run" leaving absolutely no time for site tidiness.:(