Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
Is anybody going to answer the question; was it technical, political, greased palms, downright bloody mindless, or pro siemens or anti Alstom clic within SNCF (you can forget any E* board input was minimal as usual)?
If ES and partners should be successful with the East Coast franchise they may be able to supplement the current fleet with Nols, which incedently have not retained their channel tunnel running status.
The contractor (CEIT) for the interiors has gone into liquidation and all the components being manufactured by them or sub contactors have been seized by the liquidators. Consequently the only completed units are the two powercars 3015/6. All the trailers are still "work in progress".
There...
Running under own power within TMI only, being used for engineering training. Not allowed out to play on the HS1 until signalling upgrades have been made, but still no dates.
The company (CEIT) who were contracted to supply the majority of the interior components has gone bust, without anywhere near being able to supply all the components required so that has put 3015/16 trailers into the long grass, for the foreseeable future
Another set has gone to Hellemes, but...
Originally the 373 had been intended to split into two half sets. if a tunnel failure occurred. The passengers in the dead set would moved in the other set, the train would then split from the dead set and driven out of the tunnel. Although practiced years ago, it has never happened in realtime...
In October according to public accounts (that tax pays money) HS2 spent £200,000 on PR and £250,000 on PR "advice" from KPMG. This is from the public purse that pays for everything from normal railway funding to school dinners subsidy.
I travel a couple of times a month on this service between Grantham and Norwich.
Lots of nice ideas on these posts regarding rolling stock. but the infrastructure at the eastern end will still cause problems for years to come.
Ely: All the money is now to be spent on ungrading the King...
Latest estimates is April/May 2014
The budget is not unlimited. The funding for the 373 refurb is part of original financial deal negotiated for the purchase of 374 sets (total cost £700m, refurbs £200m)
--- old post above --- --- new post below ---
If you travel by temple mills on the...
Lots of very valid points from the posts in this thread. My own conclusion is that of the many routes that I have travelled during the last couple of summers, have the appearance of a railway passing through an enchanted forest which is very nice for summer leisure trips, but fatal for winter...
if they did they would have to be called grubby white rose to match their TMST cousins current condition.
Looks like a play off between the frogs and Gerry's to me (SNCF & DB)
373's were designed for a working life of 30 years, and in common with SNCF TGV's of the same era a mid life rebuild at approximately 15 years.
If this scheme had been adhered to then the whole fleet would have been rebuilt during the period 2007 to 2009.
Ballast damaged at 186 mph can be...
Some TMST sets had been provisionally withdraw from service. But I have heard that the continuing delays (nothing now scheduled in 2013) to Velaro deliveries and the 373 set being refurbed at Hellemmes have thrown a spanner into the works.
Last time I saw a NOL in service it was diagrammed...
We are aware of an issue with emails from the Forum to Microsoft-based email accounts (hotmail/outlook/live.com email addresses). This is being looked into currently, thanks for your patience meanwhile.