• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. GraphitProjekt

    What is Control (not a philosophical discussion!)

    I think class 9s for Avanti mean they're going through New Street and not Trent Valley. EL trains are class 9 unless they're going TfL rail style and terminating at the high level platforms On LO I think only trains that go through the East London Line are class 9 Transpennine Trains doing...
  2. GraphitProjekt

    What is Control (not a philosophical discussion!)

    What are the approximate boundaries of West Yorkshire and Central (which i'd assume is maybe like the Sheffield MDU area) seems like the TRCs are crossing Route boundaries, because doesn't the whole ECML belong to its own NR Route within Eastern while the rest is "North & East"? I suppose in...
  3. GraphitProjekt

    What is Control (not a philosophical discussion!)

    Thank you for these, interested to know what it means for the inner and outer NwR TRCs to *not* deal with any class 9 TL services, even though they'll be on the same tracks as other trains.
  4. GraphitProjekt

    Paddington-Reading blocked due to OLE isolation and lineside fire (5/9)

    Will they be pan up anywhere? Or is it just simpler to cancel electric working route wide.
  5. GraphitProjekt

    Paddington-Reading blocked due to OLE isolation and lineside fire (5/9)

    They should really install a neutral section somewhere at Reading that way Holly Cross could actually be used to take some of the load off, although such an intervention would be much more useful for N-2 of Foxhall because ultimately, without Kensal Green, anything west of Maidenhead is going to...
  6. GraphitProjekt

    Paddington-Reading blocked due to OLE isolation and lineside fire (5/9)

    I think there was another N-2 of Kensal Green on 13 Aug. But I've no idea what that issue was exactly
  7. GraphitProjekt

    What is Control (not a philosophical discussion!)

    Ah I see, interesting the Incident Controllers have a smaller remit than TRCs, suggests something of how all these concepts are meant to function. I suppose an incident controller will have a lot of different people to talk to surrounding all the different parties involved in something, whereas...
  8. GraphitProjekt

    Paddington-Reading blocked due to OLE isolation and lineside fire (5/9)

    Longer feeding distances is both an advantage and an disadvantage of the AT system, neutral sections are normally considered a hindrance for all sorts of reasons, but in the case of emergency isolations you suddenly want more of them. I think in some niche cases, neutral sections have been put...
  9. GraphitProjekt

    Paddington-Reading blocked due to OLE isolation and lineside fire (5/9)

    Yeah most likely Didcot ATFS extended past it's usual boundary at Maidenhead to feed as far east as you could go (does anyone know how much was switched back on?). It might theoretically be possible to pull some switches around the Westbourne Park portal to feed Paddington from the XR core but I...
  10. GraphitProjekt

    What is Control (not a philosophical discussion!)

    Interesting, thanks. Looks like there was already a division between the Trent Valley+via Stoke lines and the rest that would eventually become a Route boundary. I think I'm missing something, but if the previous four controllers (WCN, WCS, WM, Ch) are *not* the TRCs? Then who are they?
  11. GraphitProjekt

    Paddington-Reading blocked due to OLE isolation and lineside fire (5/9)

    As you can kinda see on the Google Earth 3d view, I think these cable runs likely carry all the circuits between Kensal Green substation ("A") and the point at which they connect to the OLE ("B") which is not a very long distance at all, so a very unfortunately located fire. I'd imagine at least...
  12. GraphitProjekt

    What is Control (not a philosophical discussion!)

    I'd be quite interested to know if anyone can share any examples of how geographies are divided up within a Route by NR Train Running Controllers, and within a company area by TOC Service Controllers (although these are sometimes also called TRCs??). Obviously, I'd imagine it has a lot to do...
  13. GraphitProjekt

    WCML substations

    Is the Bushey area PSU work actually undergoing construction at the moment? If not it'd be surprising if anything could be done at such short notice. I do wonder if the issue with Bushey netural section itself is any closer to being resolved? Not being able to separate phase at Bushey would...
  14. GraphitProjekt

    What is Control (not a philosophical discussion!)

    Interesting to learn about the consequences of Central and WCML South routes. I think they're trying to make a WCML North route as well, maybe to ultimately join them together like East Coast route? So what was the justification for NR splitting apart the Midland area into Central and WCML...
  15. GraphitProjekt

    Dale Charman to leave LUL

    How did he manage to come from Portsmouth to St Albans but miss London on the way?
  16. GraphitProjekt

    Electrifying Mainlines for Battery Train operation (using Class 897 as an example

    It's what they did in Norwich too! As well as attempting to build an electrified swing bridge, there are also 2 cables across the riverbed. I think the Dutch way is to coast over but I presume this isn't an option for Selby. Are there any other fully wired swing bridges out there? I very much...
  17. GraphitProjekt

    Dale Charman to leave LUL

    I got the impression from some of his videos that Dale may have intended to join a local TOC suggesting he moved out to Peterborough possibly living closer to London earlier on. But for personal reasons that didn't happen. Interesting that the GN outer suburban routes used to be good enough to...
  18. GraphitProjekt

    British electrification OHL dates (mainly 25kV plus the most significant 1.5KV DC)

    Yeah it was definitely still 6.6kV but at 50hz. Just about every primary and secondary souce on the subject agrees with that as the scheme was to test on-board rectification of 50hz not to test 25kV clearances which would be the Styal line and the Clacton line.
  19. GraphitProjekt

    Electrifying Mainlines for Battery Train operation (using Class 897 as an example

    Thinking about the fact Gilberdike is pretty much 17 miles from both Hull and Hambleton. It does make me think that the plan was to put a midpoint substation at that junction and feed eastwards from a new feeder somewhere in Hull. (Hull South 132kV near to Paragon seems like a good spot to me)...

Top