• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. 4

    Class 730/2 incorrect platform length announcement

    Re the situation with Crewe, the issue with only the doors on the front three cars opening only arises if the train is routed into plt 6 in the up direction. As Bungle965 says, this is due to the positioning of the balise, which is in the wrong position for trains taking the normal route from...
  2. 4

    New clock unveiled

    That looks really cool
  3. 4

    RMT industrial action 5th - 12 September 2025

    Does anyone know whether Thameslink will be able to call at Farringdon on strike days?
  4. 4

    London St Pancras to Heathrow - no PRV fares

    Can someone please explain why I can't find a fare with PRV discount from St Pancras to Heathrow Terminal 5/Heathrow Rail? I can find fares to from Heathrow from one station either side i.e. Kentish Town and Farringdon but not from St Pancras itself. This doesn't make sense
  5. 4

    What does the vertical banner repeater mean on this?

    Precisely. One example is at Sandwell & Dudley where the line speed IIRC is 75 mph
  6. 4

    RMT Strike (Avanti) February

    Just checked traintimes.org.uk and it does indeed look like the normal timetable has been reinstated for this Sunday (Feb 16)
  7. 4

    Catch them before they're gone

    Thanks both. Will try to catch 'em while I can
  8. 4

    Catch them before they're gone

    Hoping this question isn't off topic as so far this thread has focused on Europe, but does anyone know if the XPT sets are still in regular use in Australia?
  9. 4

    Driving Trains in foggy weather

    Also New Street IIRC
  10. 4

    Shrewsbury Connection

    From what I remember the ticket barriers comprised of one man* in a booth with a narrow doorway between the booth and a floor to ceiling high fence. The doorway to platform 4 was permanently open when the station was open. I don't know how late in the evening the barrier was manned* until as I...
  11. 4

    Shrewsbury Connection

    Yes. See my post #20 on page 1 of this thread
  12. 4

    Shrewsbury Connection

    AIUI the footbridge at the south end of the station was removed around the time that platforms 1-3 were taken out of scheduled passenger use during the Beeching era. During this period the ticket office was moved from the station entrance to the top of the staircase to platforms 4-7. There...
  13. 4

    Storm Bert Saturday 23rd November

    Not sure if it's anything to do with the storm, but 1H91 lost 45 minutes between Mickle Trafford and Frodsham. Ended up scrapping my plans for the evening as a result
  14. 4

    National rail app no longer reliable

    I suspect there may be some form of system outage at the moment. I've tried traintimes.org.uk and nationalrail.co.uk this afternoon and both returned error messages rather than train times
  15. 4

    So many announcements, so few people taking them on board

    Was at Frodsham station this afternoon and my train to Manchester was delayed. The announcement for this delay (13 minutes) was played every 60 seconds from 3 minutes before the train's schedule arrival until it actually arrived. This was despite the length of the delay never changing. Surely...
  16. 4

    Your Operator of the Year 2023

    Of the operators I've used for more than one round trip this year, which are Avanti West Coast, Crossrail, Merseyrail, Northern and Transport for Wales, I would say: Best: Transport for Wales. Despite being the operator I travel with most, I've not experienced a single cancellation and only...
  17. 4

    Elizabeth Line now has most cancellations

    Used Crossrail on two separate days recently travelling to/from Heathrow T4. First time was fine. Second would have been a nightmare had I been trying to catch a flight rather than going to a hotel as there was a 35 minute gap in the service to T4. Cancellations may not be an issue for those...
  18. 4

    WCML signalling

    AFAIK there is no underpass for horses (or anything else) at Norton Crossing which appears to be quite well used by locals. What will happen to its usage levels when all he proposed housing is built remains to be seen. I believe the road from Murdishaw to the crossing is to be retained as some...
  19. 4

    Are Trans Pennine Express reliable ?

    in my experience they've been very 'reliable' recently. Two times in the last month I've saved at least half an hour by catching a late running Trans Pennine Express and not having to wait for a Northern local

Top