Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
It’s the same setup as the Guards panels on 222s. Combined close and interlock button. When dispatching you wait for it to light up before giving the bells.
No new train since 2014 (?) has been delivered with above solebar CET and tanking ability following a change in the relevant standards. Not a spec oversight issue.
An outline business case was prepared in late 2020 in conjunction with some early ECML ESG work and further work to optimise the MML timetable as it was becoming clear how travel was changing.
It would have required a small follow-on order of 3x 810s (minimum Hitachi would entertain, 2 for...
Don’t know about post 2017, but at the end of the SWT franchise the catering operation required a net subsidy of around £4m pa. Sales covered around 40-50% of the total cost, and were decreasing year on year.
As someone else pointed out above, in the scheme of a £850m railway to operate, a £4m...
The market for these stations to Walsall is virtually non-existent. As much as local politics is loud, the reality is very few journeys paying not a lot is a very expensive and very limited social benefit.
The destination of trains north of the stations is largely irrelevant, but providing...
TOCs are fully aware. Oval is a political project - there are a number of factors that TOCs don’t like, and a number of solutions and alternatives proposed by TOCs that politicians don’t like. It is an uneasy compromise.
There is a well known split anomaly on a route described above. The...
Pantograph is incompatible with the restricted height in StP box. Until someone can invent a 110mph pantograph that can fit into the required space, there is no electric route.
Pretty much. There’ll be the odd 730 or 350 on a non 730 or 350 “route” as required for either stock moves or provision of passenger demand.
Intent was to get as many of the longer distance routes out of Euston at full length 240m long, particularly weekends. Not sure yet how close that’ll be...
As detailed in another thread, the rollout is really very tricky so necessitates a few trips that weren’t originally planned to fit round the stabling restrictions and keep the fleet cycling while managing the cascade out of 350/2.
Long term when all the stabling is available and the fleet...
Bad example - ML is Heathrow based, so will just be rotating in and out as needs require.
There are 12x 777 permanently based at Gatwick, with up to 3x Heathrow based frames supplementing at any one time. Gatwick examples retain the original CW seats, Heathrow are fully refurbed into new CS...
Not sure what all the concern about capacity is about. Chiltern appear to be withdrawing 25 - not particularly intensively used - passenger carrying vehicles and replacing them with 65. (Admittedly I thought they had more currently).
Evidently some moving parts we don’t know, but combined with...
Not sure about early privatisation, but certainly in mid years leading up to the Arriva Northern bid when they were aggressively touting their products, they were cheap on paper but financiers put a heavy premium on them for various reasons (local financing risk, ability to meet the spec, etc)...
Updated maps will be installed shortly on the /2s, not the highest priority on a rollout of a new fleet but important to get right once final deployment determined.
Ultimately not a massive issue given over 70% passengers plan their journey via Trainline or other app.
The unit and traincrew diagrams to replace 350/2 are really complex. The railway is essentially moving from a Northampton and Crewe based one to a Bletchley based railway. In time that comes with all sorts of benefits but in the interim, the rollout is complex and full of nasty surprises. I’ve...
Indeed. You only have to see the reactionary impact during disruption. Mind you, there are some TOCs that have only just removed the requirement for a high and low speed RBT. Modern units are not loose shunted wagons, and shouldn’t be treated as such.
1750889371
Last Thurs I think it was, I was...
We are aware of an issue with emails from the Forum to Microsoft-based email accounts (hotmail/outlook/live.com email addresses). This is being looked into currently, thanks for your patience meanwhile.